SWTCH Energy
AvailableEV charging station in Burlington, Massachusetts on the SWTCH network — 9 Level 2. US DOE AFDC station 419972.
At a glance
SWTCH Energy is a public EV charging station at 200 Summit Dr in Burlington, Massachusetts, on the SWTCH network. It has 9 charging ports (9 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 16, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 419972 |
| Network | SWTCH |
| Status | Available (E) |
| Access | Public |
| Facility | Office building |
| Open date | Jun 16, 2025 |
| Last updated at source | Feb 2, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: Free
Location
- Address
- 200 Summit Dr
- City
- Burlington
- State
- Massachusetts
- ZIP
- 01803
- Coordinates
- 42.47487, -71.21650
Within ~15 km
Nearby charging
- Encore Boston Harbor62 ports
Loop · Available
- Encore Boston Harbor Private43 ports
Loop · Available
Tesla Destination · Available
- Thayer Associates30 ports
Loop · Available
- 100 Chestnut Street29 ports
AmpUp · Available
- 280 Western Ave26 ports
AmpUp · Available
What kind of charging does SWTCH Energy offer?
Of its 9 ports, 9 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 3.4 times the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a office building location. It is flagged as workplace charging.
How does SWTCH Energy compare with other stations in Burlington?
Burlington has 48 charging stations in the DOE registry with 116 ports, the 14th-most of 331 cities and towns in Massachusetts. SWTCH Energy accounts for 8% of the charging ports in Burlington. It is the only SWTCH station in Burlington. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates SWTCH Energy?
SWTCH operates 657 stations in the registry across 32 states, with 318 DC fast and 2,390 Level 2 ports in total. 22 of those stations are in Massachusetts, under 1% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 16, 2025, one of 680 stations in Massachusetts with a 2025 open date. The station's record was last updated at the source on Feb 2, 2026.
Frequently asked questions
How many chargers does SWTCH Energy have?
SWTCH Energy has 9 charging ports: 9 Level 2.
Does SWTCH Energy have DC fast charging?
No. The registry lists no DC fast ports here; its 9 ports are all Level 2.
What connectors does SWTCH Energy have?
SWTCH Energy has J1772 connectors.
Is charging at SWTCH Energy free?
Pricing as reported to the DOE registry: Free.
Is SWTCH Energy open to the public?
Yes. SWTCH Energy is listed with public access, and its status is available.
Where is SWTCH Energy?
SWTCH Energy is at 200 Summit Dr, Burlington, MA 01803. Its coordinates are 42.47487, -71.21650.
More EV charging around Burlington
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 419972, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “SWTCH Energy, Burlington, MA (AFDC station 419972)”, https://chargecensus.com/stations/massachusetts/swtch-energy-419972 (data as of October 12, 2026).