Swampscott Townhall Right
AvailableEV charging station in Swampscott, Massachusetts on the ChargePoint network — 1 Level 2. US DOE AFDC station 329610.
At a glance
Swampscott Townhall Right is a public EV charging station at 22 Monument Ave in Swampscott, Massachusetts, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 1, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 329610 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 1, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 22 Monument Ave
- City
- Swampscott
- State
- Massachusetts
- ZIP
- 01907
- Coordinates
- 42.46965, -70.91839
Within ~15 km
Nearby charging
- MGH Charlestown 199 Garage32 ports
Non-networked · Available
- Cummings Center30 ports
Non-networked · Available
- Sbwtc24 ports
Blink · Available
- Base Boston24 ports
Non-networked · Available
- Center Plaza Garage22 ports
AmpUp · Available
ChargePoint · Available
What kind of charging does Swampscott Townhall Right offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 62% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Swampscott Townhall Right compare with other stations in Swampscott?
Swampscott has 11 charging stations in the DOE registry with 15 ports. Swampscott Townhall Right accounts for 7% of the charging ports in Swampscott. ChargePoint runs 11 stations in Swampscott. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Swampscott Townhall Right?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 1, 2024, one of 833 stations in Massachusetts with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Swampscott Townhall Right have?
Swampscott Townhall Right has 1 charging port: 1 Level 2.
Does Swampscott Townhall Right have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Swampscott Townhall Right have?
Swampscott Townhall Right has J1772 connectors.
Is Swampscott Townhall Right open to the public?
Yes. Swampscott Townhall Right is listed with public access, and its status is available.
Where is Swampscott Townhall Right?
Swampscott Townhall Right is at 22 Monument Ave, Swampscott, MA 01907. Its coordinates are 42.46965, -70.91839.
More EV charging around Swampscott
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 329610, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Swampscott Townhall Right, Swampscott, MA (AFDC station 329610)”, https://chargecensus.com/stations/massachusetts/swampscott-townhall-right-329610 (data as of October 12, 2026).