Station Street Parking Lot
AvailableEV charging station in Hingham, Massachusetts on the FLO network — 4 Level 2. US DOE AFDC station 233270.
At a glance
Station Street Parking Lot is a public EV charging station at 62 Water Street in Hingham, Massachusetts, on the FLO network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 11, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 233270 |
| Network | FLO |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 11, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 62 Water Street
- City
- Hingham
- State
- Massachusetts
- ZIP
- 02043
- Coordinates
- 42.24461, -70.88401
Within ~15 km
Nearby charging
- Avalon Quincy Adams83 ports
Loop · Available
ChargePoint · Available
bp pulse · Available
- MassPort West Garage20 ports
ChargePoint · Available
- MassPort Central Garage18 ports
ChargePoint · Available
Tesla Supercharger · Available
What kind of charging does Station Street Parking Lot offer?
Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 51% above the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Station Street Parking Lot compare with other stations in Hingham?
Hingham has 11 charging stations in the DOE registry with 29 ports. Station Street Parking Lot accounts for 14% of the charging ports in Hingham. FLO runs 8 stations in Hingham. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Station Street Parking Lot?
FLO operates 1,246 stations in the registry across 40 states, with 179 DC fast and 2,934 Level 2 ports in total. 83 of those stations are in Massachusetts, 2% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 11, 2022, one of 551 stations in Massachusetts with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Station Street Parking Lot have?
Station Street Parking Lot has 4 charging ports: 4 Level 2.
Does Station Street Parking Lot have DC fast charging?
No. The registry lists no DC fast ports here; its 4 ports are all Level 2.
What connectors does Station Street Parking Lot have?
Station Street Parking Lot has J1772 connectors.
Is Station Street Parking Lot open to the public?
Yes. Station Street Parking Lot is listed with public access, and its status is available.
Where is Station Street Parking Lot?
Station Street Parking Lot is at 62 Water Street, Hingham, MA 02043. Its coordinates are 42.24461, -70.88401.
More EV charging around Hingham
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 233270, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Station Street Parking Lot, Hingham, MA (AFDC station 233270)”, https://chargecensus.com/stations/massachusetts/station-street-parking-lot-233270 (data as of October 12, 2026).