ChargeCensus

Station 800 Tech Sq. Grg #5

Available

EV charging station in Cambridge, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 316799.

At a glance

Station 800 Tech Sq. Grg #5 is a public EV charging station at 800 Technology Square in Cambridge, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 7, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID316799
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateNov 7, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
800 Technology Square
ZIP
02139
Coordinates
42.36516, -71.09183

Within ~15 km

Nearby charging

What kind of charging does Station 800 Tech Sq. Grg #5 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Station 800 Tech Sq. Grg #5 compare with other stations in Cambridge?

Cambridge has 409 charging stations in the DOE registry with 968 ports, the 2nd-most of 331 cities and towns in Massachusetts. Station 800 Tech Sq. Grg #5 accounts for under 1% of the charging ports in Cambridge. ChargePoint runs 375 stations in Cambridge. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Station 800 Tech Sq. Grg #5?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 7, 2023, one of 633 stations in Massachusetts with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Station 800 Tech Sq. Grg #5 have?

Station 800 Tech Sq. Grg #5 has 2 charging ports: 2 Level 2.

Does Station 800 Tech Sq. Grg #5 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Station 800 Tech Sq. Grg #5 have?

Station 800 Tech Sq. Grg #5 has J1772 connectors.

Is Station 800 Tech Sq. Grg #5 open to the public?

Yes. Station 800 Tech Sq. Grg #5 is listed with public access, and its status is available.

Where is Station 800 Tech Sq. Grg #5?

Station 800 Tech Sq. Grg #5 is at 800 Technology Square, Cambridge, MA 02139. Its coordinates are 42.36516, -71.09183.

More EV charging around Cambridge

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 316799, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Station 800 Tech Sq. Grg #5, Cambridge, MA (AFDC station 316799)”, https://chargecensus.com/stations/massachusetts/station-800-tech-sq-grg-5-316799 (data as of October 12, 2026).