Sherborn Town Hall
AvailableEV charging station in Sherborn, Massachusetts on the evGateway network — 2 DC fast. US DOE AFDC station 395296.
At a glance
Sherborn Town Hall is a public EV charging station at 19 Washington St in Sherborn, Massachusetts, on the evGateway network. It has 2 charging ports (2 DC fast) with CCS and NACS (Tesla) connectors. The US DOE registry lists it as available, open since May 9, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 395296 |
| Network | evGateway |
| Status | Available (E) |
| Access | Public |
| Open date | May 9, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
- NACS (Tesla) — The North American Charging Standard connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 19 Washington St
- City
- Sherborn
- State
- Massachusetts
- ZIP
- 01770
- Coordinates
- 42.23965, -71.37133
Within ~15 km
Nearby charging
- Staples26 ports
Loop · Available
- Sherwood Plaza Front20 ports
Red E · Available
- Department of Correction Milford20 ports
Non-networked · Available
Blink · Available
Tesla Supercharger · Available
- 45 Washington St12 ports
EV Connect · Available
What kind of charging does Sherborn Town Hall offer?
Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists 2 connector types: CCS, Combined Charging System — the J1772-based DC fast connector; NACS (Tesla), the North American Charging Standard connector.
How does Sherborn Town Hall compare with other stations in Sherborn?
Sherborn has 2 charging stations in the DOE registry with 4 ports. Sherborn Town Hall accounts for 50% of the charging ports in Sherborn. It is the only evGateway station in Sherborn. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Sherborn Town Hall?
evGateway operates 481 stations in the registry across 42 states, with 560 DC fast and 2,523 Level 2 ports in total. 6 of those stations are in Massachusetts, under 1% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 9, 2025, one of 680 stations in Massachusetts with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Sherborn Town Hall have?
Sherborn Town Hall has 2 charging ports: 2 DC fast.
Does Sherborn Town Hall have DC fast charging?
Yes. The registry lists 2 DC fast ports at Sherborn Town Hall, with CCS and NACS (Tesla) connectors.
What connectors does Sherborn Town Hall have?
Sherborn Town Hall has CCS and NACS (Tesla) connectors.
Is Sherborn Town Hall open to the public?
Yes. Sherborn Town Hall is listed with public access, and its status is available.
Where is Sherborn Town Hall?
Sherborn Town Hall is at 19 Washington St, Sherborn, MA 01770. Its coordinates are 42.23965, -71.37133.
More EV charging around Sherborn
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 395296, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Sherborn Town Hall, Sherborn, MA (AFDC station 395296)”, https://chargecensus.com/stations/massachusetts/sherborn-town-hall-395296 (data as of October 12, 2026).