Riverside Bldg Station 1
Temporarily unavailableEV charging station in Gill, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 185242.
At a glance
Riverside Bldg Station 1 is a public EV charging station at 54 French King Hwy in Gill, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as temporarily unavailable, open since Feb 20, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 185242 |
| Network | ChargePoint |
| Status | Temporarily unavailable (T) |
| Access | Public |
| Open date | Feb 20, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 54 French King Hwy
- City
- Gill
- State
- Massachusetts
- ZIP
- 01354
- Coordinates
- 42.61020, -72.54354
Within ~15 km
Nearby charging
- Ford of Greenfield9 ports
Blink · Available
- Leary Parking Lot4 ports
Autel · Available
Non-networked · Available
- Yankee Candle Flagship Store2 ports
AmpUp · Available
- Town Deerfield Learylot 22 ports
ChargePoint · Available
- Town Deerfield Leary Lot #12 ports
ChargePoint · Available
What kind of charging does Riverside Bldg Station 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Riverside Bldg Station 1 compare with other stations in Gill?
Gill has 1 charging station in the DOE registry with 2 ports. It is the only ChargePoint station in Gill. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Riverside Bldg Station 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.
What does the “Temporarily unavailable” status mean?
“Temporarily unavailable” means the station exists but is reported as temporarily out of service. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 20, 2021, one of 933 stations in Massachusetts with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Riverside Bldg Station 1 have?
Riverside Bldg Station 1 has 2 charging ports: 2 Level 2.
Does Riverside Bldg Station 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Riverside Bldg Station 1 have?
Riverside Bldg Station 1 has J1772 connectors.
Is Riverside Bldg Station 1 open to the public?
Yes. Riverside Bldg Station 1 is listed with public access, and its status is temporarily unavailable.
Where is Riverside Bldg Station 1?
Riverside Bldg Station 1 is at 54 French King Hwy, Gill, MA 01354. Its coordinates are 42.61020, -72.54354.
More EV charging around Gill
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 185242, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Riverside Bldg Station 1, Gill, MA (AFDC station 185242)”, https://chargecensus.com/stations/massachusetts/riverside-bldg-station-1-185242 (data as of October 12, 2026).