River'S Edge Bank Side
AvailableEV charging station in Fall River, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 257843.
At a glance
River'S Edge Bank Side is a public EV charging station at 697 Davol St in Fall River, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 4, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 257843 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Apr 4, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 697 Davol St
- City
- Fall River
- State
- Massachusetts
- ZIP
- 02720
- Coordinates
- 41.71304, -71.15537
Within ~15 km
Nearby charging
- Bristol Community College12 ports
Red E · Available
- Charlton Hospital10 ports
AmpUp · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Elite Gas6 ports
Quickcharge · Available
- Union Medical Developers6 ports
Non-networked · Available
What kind of charging does River'S Edge Bank Side offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does River'S Edge Bank Side compare with other stations in Fall River?
Fall River has 51 charging stations in the DOE registry with 131 ports, the 13th-most of 331 cities and towns in Massachusetts. River'S Edge Bank Side accounts for 2% of the charging ports in Fall River. ChargePoint runs 35 stations in Fall River. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates River'S Edge Bank Side?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 4, 2023, one of 633 stations in Massachusetts with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does River'S Edge Bank Side have?
River'S Edge Bank Side has 2 charging ports: 2 Level 2.
Does River'S Edge Bank Side have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does River'S Edge Bank Side have?
River'S Edge Bank Side has J1772 connectors.
Is River'S Edge Bank Side open to the public?
Yes. River'S Edge Bank Side is listed with public access, and its status is available.
Where is River'S Edge Bank Side?
River'S Edge Bank Side is at 697 Davol St, Fall River, MA 02720. Its coordinates are 41.71304, -71.15537.
More EV charging around Fall River
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 257843, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “River'S Edge Bank Side, Fall River, MA (AFDC station 257843)”, https://chargecensus.com/stations/massachusetts/river-s-edge-bank-side-257843 (data as of October 12, 2026).