Quirk Quirk Gen 3 Exp
AvailableEV charging station in Braintree, Massachusetts on the ChargePoint network — 2 DC fast. US DOE AFDC station 405881.
At a glance
Quirk Quirk Gen 3 Exp is a public EV charging station at 575 Quincy Ave in Braintree, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Jul 11, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 405881 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jul 11, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 575 Quincy Ave
- City
- Braintree
- State
- Massachusetts
- ZIP
- 02184
- Coordinates
- 42.23644, -70.97847
Within ~15 km
Nearby charging
- Avalon Quincy Adams83 ports
Loop · Available
Tesla Destination · Available
- MGH Charlestown 199 Garage32 ports
Non-networked · Available
- Thayer Associates30 ports
Loop · Available
- 100 Chestnut Street29 ports
AmpUp · Available
- Sbwtc24 ports
Blink · Available
What kind of charging does Quirk Quirk Gen 3 Exp offer?
Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.
How does Quirk Quirk Gen 3 Exp compare with other stations in Braintree?
Braintree has 26 charging stations in the DOE registry with 88 ports. Quirk Quirk Gen 3 Exp accounts for 2% of the charging ports in Braintree. ChargePoint runs 15 stations in Braintree. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Quirk Quirk Gen 3 Exp?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 11, 2025, one of 680 stations in Massachusetts with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Quirk Quirk Gen 3 Exp have?
Quirk Quirk Gen 3 Exp has 2 charging ports: 2 DC fast.
Does Quirk Quirk Gen 3 Exp have DC fast charging?
Yes. The registry lists 2 DC fast ports at Quirk Quirk Gen 3 Exp, with CCS connectors.
What connectors does Quirk Quirk Gen 3 Exp have?
Quirk Quirk Gen 3 Exp has CCS connectors.
Is Quirk Quirk Gen 3 Exp open to the public?
Yes. Quirk Quirk Gen 3 Exp is listed with public access, and its status is available.
Where is Quirk Quirk Gen 3 Exp?
Quirk Quirk Gen 3 Exp is at 575 Quincy Ave, Braintree, MA 02184. Its coordinates are 42.23644, -70.97847.
More EV charging around Braintree
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 405881, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Quirk Quirk Gen 3 Exp, Braintree, MA (AFDC station 405881)”, https://chargecensus.com/stations/massachusetts/quirk-quirk-gen-3-exp-405881 (data as of October 12, 2026).