Plymouth Mosquito Control Project
AvailableEV charging station in Plymouth, Massachusetts, not on a charging network — 8 Level 2. US DOE AFDC station 450632.
At a glance
Plymouth Mosquito Control Project is a private EV charging station at 272 S Meadow Rd in Plymouth, Massachusetts, not attached to a charging network. It has 8 charging ports (8 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 12, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 450632 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Private |
| Facility | State government |
| Open date | Jan 12, 2024 |
| Last updated at source | Feb 13, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 272 S Meadow Rd
- City
- Plymouth
- State
- Massachusetts
- ZIP
- 02360
- Coordinates
- 41.91033, -70.73520
Within ~15 km
Nearby charging
- Wareham, MA - Tesla Supercharger12 ports
Tesla Supercharger · Available
- Wareham Ford10 ports
Autel · Available
Tesla Supercharger · Available
ChargePoint · Available
Non-networked · Available
- Geko Gas Station4 ports
Red E · Available
What kind of charging does Plymouth Mosquito Control Project offer?
Of its 8 ports, 8 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 3 times the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a state government location.
How does Plymouth Mosquito Control Project compare with other stations in Plymouth?
Plymouth has 31 charging stations in the DOE registry with 73 ports. Plymouth Mosquito Control Project accounts for 11% of the charging ports in Plymouth. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Plymouth Mosquito Control Project?
Plymouth Mosquito Control Project is listed as non-networked: its chargers are not run through a charging-network account. Massachusetts has 288 non-networked stations, 6% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is private, meaning use is restricted, for example to a fleet, employees or residents. It opened on Jan 12, 2024, one of 833 stations in Massachusetts with a 2024 open date. The station's record was last updated at the source on Feb 13, 2026.
Frequently asked questions
How many chargers does Plymouth Mosquito Control Project have?
Plymouth Mosquito Control Project has 8 charging ports: 8 Level 2.
Does Plymouth Mosquito Control Project have DC fast charging?
No. The registry lists no DC fast ports here; its 8 ports are all Level 2.
What connectors does Plymouth Mosquito Control Project have?
Plymouth Mosquito Control Project has J1772 connectors.
Is Plymouth Mosquito Control Project open to the public?
No. Plymouth Mosquito Control Project is listed with private access.
Where is Plymouth Mosquito Control Project?
Plymouth Mosquito Control Project is at 272 S Meadow Rd, Plymouth, MA 02360. Its coordinates are 41.91033, -70.73520.
More EV charging around Plymouth
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 450632, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Plymouth Mosquito Control Project, Plymouth, MA (AFDC station 450632)”, https://chargecensus.com/stations/massachusetts/plymouth-mosquito-control-project-450632 (data as of October 12, 2026).