ChargeCensus

Oconnell Comp Ground Floor

Available

EV charging station in Springfield, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 167512.

At a glance

Oconnell Comp Ground Floor is a public EV charging station at 1755 Main St in Springfield, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 14, 2020.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID167512
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateOct 14, 2020
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
1755 Main St
ZIP
01103
Coordinates
42.10529, -72.59518

Within ~15 km

Nearby charging

What kind of charging does Oconnell Comp Ground Floor offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Oconnell Comp Ground Floor compare with other stations in Springfield?

Springfield has 90 charging stations in the DOE registry with 275 ports, the 5th-most of 331 cities and towns in Massachusetts. Oconnell Comp Ground Floor accounts for under 1% of the charging ports in Springfield. ChargePoint runs 64 stations in Springfield. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Oconnell Comp Ground Floor?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 14, 2020, one of 314 stations in Massachusetts with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Oconnell Comp Ground Floor have?

Oconnell Comp Ground Floor has 2 charging ports: 2 Level 2.

Does Oconnell Comp Ground Floor have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Oconnell Comp Ground Floor have?

Oconnell Comp Ground Floor has J1772 connectors.

Is Oconnell Comp Ground Floor open to the public?

Yes. Oconnell Comp Ground Floor is listed with public access, and its status is available.

Where is Oconnell Comp Ground Floor?

Oconnell Comp Ground Floor is at 1755 Main St, Springfield, MA 01103. Its coordinates are 42.10529, -72.59518.

More EV charging around Springfield

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 167512, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Oconnell Comp Ground Floor, Springfield, MA (AFDC station 167512)”, https://chargecensus.com/stations/massachusetts/oconnell-comp-ground-floor-167512 (data as of October 12, 2026).