ChargeCensus

Nouria Webster 2

Available

EV charging station in Webster, Massachusetts on the ChargePoint network — 1 DC fast. US DOE AFDC station 398432.

At a glance

Nouria Webster 2 is a public EV charging station at 137 E Main St in Webster, Massachusetts, on the ChargePoint network. It has 1 charging port (1 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Jun 17, 2025.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID398432
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJun 17, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
137 E Main St
City
Webster
ZIP
01570
Coordinates
42.06043, -71.86404

Within ~15 km

Nearby charging

What kind of charging does Nouria Webster 2 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 62% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.

How does Nouria Webster 2 compare with other stations in Webster?

Webster has 3 charging stations in the DOE registry with 4 ports. Nouria Webster 2 accounts for 25% of the charging ports in Webster. ChargePoint runs 2 stations in Webster. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Nouria Webster 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 17, 2025, one of 680 stations in Massachusetts with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Nouria Webster 2 have?

Nouria Webster 2 has 1 charging port: 1 DC fast.

Does Nouria Webster 2 have DC fast charging?

Yes. The registry lists 1 DC fast port at Nouria Webster 2, with CCS connectors.

What connectors does Nouria Webster 2 have?

Nouria Webster 2 has CCS connectors.

Is Nouria Webster 2 open to the public?

Yes. Nouria Webster 2 is listed with public access, and its status is available.

Where is Nouria Webster 2?

Nouria Webster 2 is at 137 E Main St, Webster, MA 01570. Its coordinates are 42.06043, -71.86404.

More EV charging around Webster

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 398432, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Nouria Webster 2, Webster, MA (AFDC station 398432)”, https://chargecensus.com/stations/massachusetts/nouria-webster-2-398432 (data as of October 12, 2026).