ChargeCensus

Nouria Wakefield 2

Available

EV charging station in Wakefield, Massachusetts on the ChargePoint network — 2 DC fast. US DOE AFDC station 388678.

At a glance

Nouria Wakefield 2 is a public EV charging station at 356 Lowell Street in Wakefield, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Mar 26, 2025.

Total ports
2
DC fast
2
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID388678
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMar 26, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
356 Lowell Street
ZIP
01880
Coordinates
42.51800, -71.06456

Within ~15 km

Nearby charging

What kind of charging does Nouria Wakefield 2 offer?

Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Nouria Wakefield 2 compare with other stations in Wakefield?

Wakefield has 24 charging stations in the DOE registry with 46 ports. Nouria Wakefield 2 accounts for 4% of the charging ports in Wakefield. ChargePoint runs 23 stations in Wakefield. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Nouria Wakefield 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 26, 2025, one of 680 stations in Massachusetts with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Nouria Wakefield 2 have?

Nouria Wakefield 2 has 2 charging ports: 2 DC fast.

Does Nouria Wakefield 2 have DC fast charging?

Yes. The registry lists 2 DC fast ports at Nouria Wakefield 2, with CHAdeMO and CCS connectors.

What connectors does Nouria Wakefield 2 have?

Nouria Wakefield 2 has CHAdeMO and CCS connectors.

Is Nouria Wakefield 2 open to the public?

Yes. Nouria Wakefield 2 is listed with public access, and its status is available.

Where is Nouria Wakefield 2?

Nouria Wakefield 2 is at 356 Lowell Street, Wakefield, MA 01880. Its coordinates are 42.51800, -71.06456.

More EV charging around Wakefield

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 388678, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Nouria Wakefield 2, Wakefield, MA (AFDC station 388678)”, https://chargecensus.com/stations/massachusetts/nouria-wakefield-2-388678 (data as of October 12, 2026).