Nouria Framingham 2
AvailableEV charging station in Framingham, Massachusetts on the ChargePoint network — 1 DC fast. US DOE AFDC station 389913.
At a glance
Nouria Framingham 2 is a public EV charging station at 876 Edgell Road in Framingham, Massachusetts, on the ChargePoint network. It has 1 charging port (1 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Apr 15, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 389913 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Apr 15, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 876 Edgell Road
- City
- Framingham
- State
- Massachusetts
- ZIP
- 01701
- Coordinates
- 42.32863, -71.43658
Within ~15 km
Nearby charging
- Staples26 ports
Loop · Available
- Sherwood Plaza Front20 ports
Red E · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- The Buckley - Surface Lot10 ports
AmpUp · Available
What kind of charging does Nouria Framingham 2 offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 62% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.
How does Nouria Framingham 2 compare with other stations in Framingham?
Framingham has 62 charging stations in the DOE registry with 197 ports, the 10th-most of 331 cities and towns in Massachusetts. Nouria Framingham 2 accounts for under 1% of the charging ports in Framingham. ChargePoint runs 44 stations in Framingham. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Nouria Framingham 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 15, 2025, one of 680 stations in Massachusetts with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Nouria Framingham 2 have?
Nouria Framingham 2 has 1 charging port: 1 DC fast.
Does Nouria Framingham 2 have DC fast charging?
Yes. The registry lists 1 DC fast port at Nouria Framingham 2, with CCS connectors.
What connectors does Nouria Framingham 2 have?
Nouria Framingham 2 has CCS connectors.
Is Nouria Framingham 2 open to the public?
Yes. Nouria Framingham 2 is listed with public access, and its status is available.
Where is Nouria Framingham 2?
Nouria Framingham 2 is at 876 Edgell Road, Framingham, MA 01701. Its coordinates are 42.32863, -71.43658.
More EV charging around Framingham
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 389913, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Nouria Framingham 2, Framingham, MA (AFDC station 389913)”, https://chargecensus.com/stations/massachusetts/nouria-framingham-2-389913 (data as of October 12, 2026).