ChargeCensus

Nouria Burlington 2

Available

EV charging station in Burlington, Massachusetts on the ChargePoint network — 1 DC fast. US DOE AFDC station 389705.

At a glance

Nouria Burlington 2 is a public EV charging station at 61 Middlesex Turnpike in Burlington, Massachusetts, on the ChargePoint network. It has 1 charging port (1 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Apr 10, 2025.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID389705
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateApr 10, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
61 Middlesex Turnpike
ZIP
01803
Coordinates
42.47507, -71.21303

Within ~15 km

Nearby charging

What kind of charging does Nouria Burlington 2 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 62% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.

How does Nouria Burlington 2 compare with other stations in Burlington?

Burlington has 48 charging stations in the DOE registry with 116 ports, the 14th-most of 331 cities and towns in Massachusetts. Nouria Burlington 2 accounts for under 1% of the charging ports in Burlington. ChargePoint runs 41 stations in Burlington. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Nouria Burlington 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 10, 2025, one of 680 stations in Massachusetts with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Nouria Burlington 2 have?

Nouria Burlington 2 has 1 charging port: 1 DC fast.

Does Nouria Burlington 2 have DC fast charging?

Yes. The registry lists 1 DC fast port at Nouria Burlington 2, with CCS connectors.

What connectors does Nouria Burlington 2 have?

Nouria Burlington 2 has CCS connectors.

Is Nouria Burlington 2 open to the public?

Yes. Nouria Burlington 2 is listed with public access, and its status is available.

Where is Nouria Burlington 2?

Nouria Burlington 2 is at 61 Middlesex Turnpike, Burlington, MA 01803. Its coordinates are 42.47507, -71.21303.

More EV charging around Burlington

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 389705, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Nouria Burlington 2, Burlington, MA (AFDC station 389705)”, https://chargecensus.com/stations/massachusetts/nouria-burlington-2-389705 (data as of October 12, 2026).