National Grid - Lowell
AvailableEV charging station in Lowell, Massachusetts, not on a charging network — 7 Level 2. US DOE AFDC station 185522.
At a glance
National Grid - Lowell is a private EV charging station at 775 Dutton St in Lowell, Massachusetts, not attached to a charging network. It has 7 charging ports (7 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 20, 2020.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 185522 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Private |
| Facility | Utility |
| Open date | Oct 20, 2020 |
| Last updated at source | Sep 14, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 775 Dutton St
- City
- Lowell
- State
- Massachusetts
- ZIP
- 01853
- Coordinates
- 42.64080, -71.32145
Within ~15 km
Nearby charging
- Abbott School29 ports
AmpUp · Available
- Bedford Campus18 ports
Blink · Available
Tesla Supercharger · Available
- Lowell, MA - Tesla Supercharger12 ports
Tesla Supercharger · Available
- Salem, NH - Tesla Supercharger12 ports
Tesla Supercharger · Available
- Fairfield Inn - Tewksbury10 ports
ChargeSmart EV · Available
What kind of charging does National Grid - Lowell offer?
Of its 7 ports, 7 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 2.6 times the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a utility location.
How does National Grid - Lowell compare with other stations in Lowell?
Lowell has 73 charging stations in the DOE registry with 171 ports, the 9th-most of 331 cities and towns in Massachusetts. National Grid - Lowell accounts for 4% of the charging ports in Lowell. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates National Grid - Lowell?
National Grid - Lowell is listed as non-networked: its chargers are not run through a charging-network account. Massachusetts has 288 non-networked stations, 6% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is private, meaning use is restricted, for example to a fleet, employees or residents. It opened on Oct 20, 2020, one of 314 stations in Massachusetts with a 2020 open date. The station's record was last updated at the source on Sep 14, 2026.
Frequently asked questions
How many chargers does National Grid - Lowell have?
National Grid - Lowell has 7 charging ports: 7 Level 2.
Does National Grid - Lowell have DC fast charging?
No. The registry lists no DC fast ports here; its 7 ports are all Level 2.
What connectors does National Grid - Lowell have?
National Grid - Lowell has J1772 connectors.
Is National Grid - Lowell open to the public?
No. National Grid - Lowell is listed with private access.
Where is National Grid - Lowell?
National Grid - Lowell is at 775 Dutton St, Lowell, MA 01853. Its coordinates are 42.64080, -71.32145.
More EV charging around Lowell
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 185522, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “National Grid - Lowell, Lowell, MA (AFDC station 185522)”, https://chargecensus.com/stations/massachusetts/national-grid-lowell-185522 (data as of October 12, 2026).