ChargeCensus

National Grid - Lowell

Available

EV charging station in Lowell, Massachusetts, not on a charging network — 7 Level 2. US DOE AFDC station 185522.

At a glance

National Grid - Lowell is a private EV charging station at 775 Dutton St in Lowell, Massachusetts, not attached to a charging network. It has 7 charging ports (7 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 20, 2020.

Total ports
7
DC fast
0
Level 2
7
Access
Private
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID185522
NetworkNon-networked
StatusAvailable (E)
AccessPrivate
FacilityUtility
Open dateOct 20, 2020
Last updated at sourceSep 14, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
775 Dutton St
City
Lowell
ZIP
01853
Coordinates
42.64080, -71.32145

Within ~15 km

Nearby charging

What kind of charging does National Grid - Lowell offer?

Of its 7 ports, 7 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 2.6 times the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a utility location.

How does National Grid - Lowell compare with other stations in Lowell?

Lowell has 73 charging stations in the DOE registry with 171 ports, the 9th-most of 331 cities and towns in Massachusetts. National Grid - Lowell accounts for 4% of the charging ports in Lowell. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates National Grid - Lowell?

National Grid - Lowell is listed as non-networked: its chargers are not run through a charging-network account. Massachusetts has 288 non-networked stations, 6% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is private, meaning use is restricted, for example to a fleet, employees or residents. It opened on Oct 20, 2020, one of 314 stations in Massachusetts with a 2020 open date. The station's record was last updated at the source on Sep 14, 2026.

Frequently asked questions

How many chargers does National Grid - Lowell have?

National Grid - Lowell has 7 charging ports: 7 Level 2.

Does National Grid - Lowell have DC fast charging?

No. The registry lists no DC fast ports here; its 7 ports are all Level 2.

What connectors does National Grid - Lowell have?

National Grid - Lowell has J1772 connectors.

Is National Grid - Lowell open to the public?

No. National Grid - Lowell is listed with private access.

Where is National Grid - Lowell?

National Grid - Lowell is at 775 Dutton St, Lowell, MA 01853. Its coordinates are 42.64080, -71.32145.

More EV charging around Lowell

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 185522, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “National Grid - Lowell, Lowell, MA (AFDC station 185522)”, https://chargecensus.com/stations/massachusetts/national-grid-lowell-185522 (data as of October 12, 2026).