Mwgroup1 Station 1
AvailableEV charging station in Framingham, Massachusetts on the ChargePoint network — 1 Level 2. US DOE AFDC station 387136.
At a glance
Mwgroup1 Station 1 is a public EV charging station at 520 Worcester Rd in Framingham, Massachusetts, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 2, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 387136 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 2, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 520 Worcester Rd
- City
- Framingham
- State
- Massachusetts
- ZIP
- 01702
- Coordinates
- 42.29742, -71.41737
Within ~15 km
Nearby charging
- Staples26 ports
Loop · Available
- Sherwood Plaza Front20 ports
Red E · Available
Blink · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
What kind of charging does Mwgroup1 Station 1 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 62% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Mwgroup1 Station 1 compare with other stations in Framingham?
Framingham has 62 charging stations in the DOE registry with 197 ports, the 10th-most of 331 cities and towns in Massachusetts. Mwgroup1 Station 1 accounts for under 1% of the charging ports in Framingham. ChargePoint runs 44 stations in Framingham. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Mwgroup1 Station 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 2, 2025, one of 680 stations in Massachusetts with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Mwgroup1 Station 1 have?
Mwgroup1 Station 1 has 1 charging port: 1 Level 2.
Does Mwgroup1 Station 1 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Mwgroup1 Station 1 have?
Mwgroup1 Station 1 has J1772 connectors.
Is Mwgroup1 Station 1 open to the public?
Yes. Mwgroup1 Station 1 is listed with public access, and its status is available.
Where is Mwgroup1 Station 1?
Mwgroup1 Station 1 is at 520 Worcester Rd, Framingham, MA 01702. Its coordinates are 42.29742, -71.41737.
More EV charging around Framingham
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 387136, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Mwgroup1 Station 1, Framingham, MA (AFDC station 387136)”, https://chargecensus.com/stations/massachusetts/mwgroup1-station-1-387136 (data as of October 12, 2026).