Mt Wachusett Cc Mwcc Sta 3
AvailableEV charging station in Gardner, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 155261.
At a glance
Mt Wachusett Cc Mwcc Sta 3 is a public EV charging station at 444 Green St in Gardner, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 9, 2020.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 155261 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Apr 9, 2020 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 444 Green St
- City
- Gardner
- State
- Massachusetts
- ZIP
- 01440
- Coordinates
- 42.59437, -71.98468
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Mathieu Ford8 ports
EV Connect · Available
ChargePoint · Available
ChargePoint · Available
- EV Charging Wachusett Lot 12 ports
ChargePoint · Available
Non-networked · Available
What kind of charging does Mt Wachusett Cc Mwcc Sta 3 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Mt Wachusett Cc Mwcc Sta 3 compare with other stations in Gardner?
Gardner has 11 charging stations in the DOE registry with 22 ports. Mt Wachusett Cc Mwcc Sta 3 accounts for 9% of the charging ports in Gardner. ChargePoint runs 9 stations in Gardner. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Mt Wachusett Cc Mwcc Sta 3?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 9, 2020, one of 314 stations in Massachusetts with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Mt Wachusett Cc Mwcc Sta 3 have?
Mt Wachusett Cc Mwcc Sta 3 has 2 charging ports: 2 Level 2.
Does Mt Wachusett Cc Mwcc Sta 3 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Mt Wachusett Cc Mwcc Sta 3 have?
Mt Wachusett Cc Mwcc Sta 3 has J1772 connectors.
Is Mt Wachusett Cc Mwcc Sta 3 open to the public?
Yes. Mt Wachusett Cc Mwcc Sta 3 is listed with public access, and its status is available.
Where is Mt Wachusett Cc Mwcc Sta 3?
Mt Wachusett Cc Mwcc Sta 3 is at 444 Green St, Gardner, MA 01440. Its coordinates are 42.59437, -71.98468.
More EV charging around Gardner
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 155261, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Mt Wachusett Cc Mwcc Sta 3, Gardner, MA (AFDC station 155261)”, https://chargecensus.com/stations/massachusetts/mt-wachusett-cc-mwcc-sta-3-155261 (data as of October 12, 2026).