Medford Bostonave1
AvailableEV charging station in Medford, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 461031.
At a glance
Medford Bostonave1 is a public EV charging station at 200 Boston Avenue in Medford, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 13, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 461031 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 13, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 200 Boston Avenue
- City
- Medford
- State
- Massachusetts
- ZIP
- 02155
- Coordinates
- 42.41481, -71.12679
Within ~15 km
Nearby charging
- Encore Boston Harbor62 ports
Loop · Available
- Encore Boston Harbor Private43 ports
Loop · Available
Tesla Destination · Available
- MGH Charlestown 199 Garage32 ports
Non-networked · Available
- Thayer Associates30 ports
Loop · Available
- 100 Chestnut Street29 ports
AmpUp · Available
What kind of charging does Medford Bostonave1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Medford Bostonave1 compare with other stations in Medford?
Medford has 34 charging stations in the DOE registry with 84 ports, the 23rd-most of 331 cities and towns in Massachusetts. Medford Bostonave1 accounts for 2% of the charging ports in Medford. ChargePoint runs 25 stations in Medford. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Medford Bostonave1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 13, 2026, one of 674 stations in Massachusetts with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Medford Bostonave1 have?
Medford Bostonave1 has 2 charging ports: 2 Level 2.
Does Medford Bostonave1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Medford Bostonave1 have?
Medford Bostonave1 has J1772 connectors.
Is Medford Bostonave1 open to the public?
Yes. Medford Bostonave1 is listed with public access, and its status is available.
Where is Medford Bostonave1?
Medford Bostonave1 is at 200 Boston Avenue, Medford, MA 02155. Its coordinates are 42.41481, -71.12679.
More EV charging around Medford
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 461031, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Medford Bostonave1, Medford, MA (AFDC station 461031)”, https://chargecensus.com/stations/massachusetts/medford-bostonave1-461031 (data as of October 12, 2026).