Mcca Lot On D 1
AvailableEV charging station in Boston, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 353899.
At a glance
Mcca Lot On D 1 is a public EV charging station at 391 D Street in Boston, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 24, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 353899 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 24, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 391 D Street
- City
- Boston
- State
- Massachusetts
- ZIP
- 02210
- Coordinates
- 42.34179, -71.04638
Within ~15 km
Nearby charging
- Avalon Quincy Adams83 ports
Loop · Available
- The Proof64 ports
Loop · Available
- Encore Boston Harbor62 ports
Loop · Available
- Encore Boston Harbor Private43 ports
Loop · Available
Tesla Destination · Available
- MGH Charlestown 199 Garage32 ports
Non-networked · Available
What kind of charging does Mcca Lot On D 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Mcca Lot On D 1 compare with other stations in Boston?
Boston has 851 charging stations in the DOE registry with 2,154 ports, the most of 331 cities and towns in Massachusetts. Mcca Lot On D 1 accounts for under 1% of the charging ports in Boston. ChargePoint runs 751 stations in Boston. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Mcca Lot On D 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 24, 2024, one of 833 stations in Massachusetts with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Mcca Lot On D 1 have?
Mcca Lot On D 1 has 2 charging ports: 2 Level 2.
Does Mcca Lot On D 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Mcca Lot On D 1 have?
Mcca Lot On D 1 has J1772 connectors.
Is Mcca Lot On D 1 open to the public?
Yes. Mcca Lot On D 1 is listed with public access, and its status is available.
Where is Mcca Lot On D 1?
Mcca Lot On D 1 is at 391 D Street, Boston, MA 02210. Its coordinates are 42.34179, -71.04638.
More EV charging around Boston
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 353899, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Mcca Lot On D 1, Boston, MA (AFDC station 353899)”, https://chargecensus.com/stations/massachusetts/mcca-lot-on-d-1-353899 (data as of October 12, 2026).