ChargeCensus

Maverick Corp

Available

EV charging station in Boston, Massachusetts on the AmpUp network — 6 Level 2. US DOE AFDC station 229717.

At a glance

Maverick Corp is a public EV charging station at 1 Westinghouse Plaza in Boston, Massachusetts, on the AmpUp network. It has 6 charging ports (6 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 15, 2022.

Total ports
6
DC fast
0
Level 2
6
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID229717
NetworkAmpUp
StatusAvailable (E)
AccessPublic
FacilityOffice building
Open dateSep 15, 2022
Last updated at sourceOct 2, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: $0.25 per kWh

Charging network

AmpUp

Operates 1,322 stations in the DOE registry — view the full network →

Location

Address
1 Westinghouse Plaza
City
Boston
ZIP
02136
Coordinates
42.24610, -71.13172

Within ~15 km

Nearby charging

What kind of charging does Maverick Corp offer?

Of its 6 ports, 6 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 2.3 times the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.25 per kWh”. The site is listed as a office building location.

How does Maverick Corp compare with other stations in Boston?

Boston has 851 charging stations in the DOE registry with 2,154 ports, the most of 331 cities and towns in Massachusetts. Maverick Corp accounts for under 1% of the charging ports in Boston. AmpUp runs 18 stations in Boston. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Maverick Corp?

AmpUp operates 1,322 stations in the registry across 47 states, with 18 DC fast and 5,339 Level 2 ports in total. 198 of those stations are in Massachusetts, 4% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 15, 2022, one of 551 stations in Massachusetts with a 2022 open date. The station's record was last updated at the source on Oct 2, 2026.

Frequently asked questions

How many chargers does Maverick Corp have?

Maverick Corp has 6 charging ports: 6 Level 2.

Does Maverick Corp have DC fast charging?

No. The registry lists no DC fast ports here; its 6 ports are all Level 2.

What connectors does Maverick Corp have?

Maverick Corp has J1772 connectors.

Is charging at Maverick Corp free?

Pricing as reported to the DOE registry: $0.25 per kWh.

Is Maverick Corp open to the public?

Yes. Maverick Corp is listed with public access, and its status is available.

Where is Maverick Corp?

Maverick Corp is at 1 Westinghouse Plaza, Boston, MA 02136. Its coordinates are 42.24610, -71.13172.

More EV charging around Boston

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 229717, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Maverick Corp, Boston, MA (AFDC station 229717)”, https://chargecensus.com/stations/massachusetts/maverick-corp-229717 (data as of October 12, 2026).