ChargeCensus

Laneco Leviton 2

Available

EV charging station in Medfield, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 316213.

At a glance

Laneco Leviton 2 is a public EV charging station at 50 Peter Kristof Way in Medfield, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 28, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID316213
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateOct 28, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
50 Peter Kristof Way
City
Medfield
ZIP
02052
Coordinates
42.19237, -71.32210

Within ~15 km

Nearby charging

What kind of charging does Laneco Leviton 2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Laneco Leviton 2 compare with other stations in Medfield?

Medfield has 5 charging stations in the DOE registry with 12 ports. Laneco Leviton 2 accounts for 17% of the charging ports in Medfield. It is the only ChargePoint station in Medfield. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Laneco Leviton 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 28, 2023, one of 633 stations in Massachusetts with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Laneco Leviton 2 have?

Laneco Leviton 2 has 2 charging ports: 2 Level 2.

Does Laneco Leviton 2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Laneco Leviton 2 have?

Laneco Leviton 2 has J1772 connectors.

Is Laneco Leviton 2 open to the public?

Yes. Laneco Leviton 2 is listed with public access, and its status is available.

Where is Laneco Leviton 2?

Laneco Leviton 2 is at 50 Peter Kristof Way, Medfield, MA 02052. Its coordinates are 42.19237, -71.32210.

More EV charging around Medfield

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 316213, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Laneco Leviton 2, Medfield, MA (AFDC station 316213)”, https://chargecensus.com/stations/massachusetts/laneco-leviton-2-316213 (data as of October 12, 2026).