ChargeCensus

Hiexpittsfield Hiexpittsfield5

Available

EV charging station in Pittsfield, Massachusetts on the ChargePoint network — 1 Level 2. US DOE AFDC station 448332.

At a glance

Hiexpittsfield Hiexpittsfield5 is a public EV charging station at 1055 South Street in Pittsfield, Massachusetts, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 25, 2025.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID448332
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateDec 25, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
1055 South Street
ZIP
01201
Coordinates
42.40756, -73.26306

Within ~15 km

Nearby charging

What kind of charging does Hiexpittsfield Hiexpittsfield5 offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 62% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Hiexpittsfield Hiexpittsfield5 compare with other stations in Pittsfield?

Pittsfield has 22 charging stations in the DOE registry with 53 ports. Hiexpittsfield Hiexpittsfield5 accounts for 2% of the charging ports in Pittsfield. ChargePoint runs 12 stations in Pittsfield. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Hiexpittsfield Hiexpittsfield5?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 25, 2025, one of 680 stations in Massachusetts with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Hiexpittsfield Hiexpittsfield5 have?

Hiexpittsfield Hiexpittsfield5 has 1 charging port: 1 Level 2.

Does Hiexpittsfield Hiexpittsfield5 have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Hiexpittsfield Hiexpittsfield5 have?

Hiexpittsfield Hiexpittsfield5 has J1772 connectors.

Is Hiexpittsfield Hiexpittsfield5 open to the public?

Yes. Hiexpittsfield Hiexpittsfield5 is listed with public access, and its status is available.

Where is Hiexpittsfield Hiexpittsfield5?

Hiexpittsfield Hiexpittsfield5 is at 1055 South Street, Pittsfield, MA 01201. Its coordinates are 42.40756, -73.26306.

More EV charging around Pittsfield

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 448332, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Hiexpittsfield Hiexpittsfield5, Pittsfield, MA (AFDC station 448332)”, https://chargecensus.com/stations/massachusetts/hiexpittsfield-hiexpittsfield5-448332 (data as of October 12, 2026).