ChargeCensus

Hale Building

Available

EV charging station in Boston, Massachusetts, not on a charging network — 16 Level 2. US DOE AFDC station 261675.

At a glance

Hale Building is a public EV charging station at 60 Fenwood Rd in Boston, Massachusetts, not attached to a charging network. It has 16 charging ports (16 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 1, 2023.

Total ports
16
DC fast
0
Level 2
16
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID261675
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityHospital
Open dateMay 1, 2023
Last updated at sourceOct 22, 2025

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
60 Fenwood Rd
City
Boston
ZIP
02115
Coordinates
42.33539, -71.10856

Within ~15 km

Nearby charging

What kind of charging does Hale Building offer?

Of its 16 ports, 16 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 6.1 times the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a hospital location.

How does Hale Building compare with other stations in Boston?

Boston has 851 charging stations in the DOE registry with 2,154 ports, the most of 331 cities and towns in Massachusetts. Hale Building accounts for under 1% of the charging ports in Boston. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Hale Building?

Hale Building is listed as non-networked: its chargers are not run through a charging-network account. Massachusetts has 288 non-networked stations, 6% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 1, 2023, one of 633 stations in Massachusetts with a 2023 open date. The station's record was last updated at the source on Oct 22, 2025.

Frequently asked questions

How many chargers does Hale Building have?

Hale Building has 16 charging ports: 16 Level 2.

Does Hale Building have DC fast charging?

No. The registry lists no DC fast ports here; its 16 ports are all Level 2.

What connectors does Hale Building have?

Hale Building has J1772 connectors.

Is Hale Building open to the public?

Yes. Hale Building is listed with public access, and its status is available.

Where is Hale Building?

Hale Building is at 60 Fenwood Rd, Boston, MA 02115. Its coordinates are 42.33539, -71.10856.

More EV charging around Boston

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 261675, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Hale Building, Boston, MA (AFDC station 261675)”, https://chargecensus.com/stations/massachusetts/hale-building-261675 (data as of October 12, 2026).