ChargeCensus

Georgetown Park and Ride

Available

EV charging station in Georgetown, Massachusetts on the AmpUp network — 2 Level 2. US DOE AFDC station 306407.

At a glance

Georgetown Park and Ride is a public EV charging station at 27 E Main St in Georgetown, Massachusetts, on the AmpUp network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 1, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID306407
NetworkAmpUp
StatusAvailable (E)
AccessPublic
FacilityParking lot
Open dateJun 1, 2023
Last updated at sourceOct 2, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: $0.26 per kWh

Charging network

AmpUp

Operates 1,322 stations in the DOE registry — view the full network →

Location

Address
27 E Main St
City
Georgetown
ZIP
01833
Coordinates
42.72396, -70.99101

Within ~15 km

Nearby charging

What kind of charging does Georgetown Park and Ride offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.26 per kWh”. The site is listed as a parking lot location.

How does Georgetown Park and Ride compare with other stations in Georgetown?

Georgetown has 5 charging stations in the DOE registry with 14 ports. Georgetown Park and Ride accounts for 14% of the charging ports in Georgetown. AmpUp runs 4 stations in Georgetown. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Georgetown Park and Ride?

AmpUp operates 1,322 stations in the registry across 47 states, with 18 DC fast and 5,339 Level 2 ports in total. 198 of those stations are in Massachusetts, 4% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 1, 2023, one of 633 stations in Massachusetts with a 2023 open date. The station's record was last updated at the source on Oct 2, 2026.

Frequently asked questions

How many chargers does Georgetown Park and Ride have?

Georgetown Park and Ride has 2 charging ports: 2 Level 2.

Does Georgetown Park and Ride have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Georgetown Park and Ride have?

Georgetown Park and Ride has J1772 connectors.

Is charging at Georgetown Park and Ride free?

Pricing as reported to the DOE registry: $0.26 per kWh.

Is Georgetown Park and Ride open to the public?

Yes. Georgetown Park and Ride is listed with public access, and its status is available.

Where is Georgetown Park and Ride?

Georgetown Park and Ride is at 27 E Main St, Georgetown, MA 01833. Its coordinates are 42.72396, -70.99101.

More EV charging around Georgetown

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 306407, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Georgetown Park and Ride, Georgetown, MA (AFDC station 306407)”, https://chargecensus.com/stations/massachusetts/georgetown-park-and-ride-306407 (data as of October 12, 2026).