Georgetown Library
AvailableEV charging station in Georgetown, Massachusetts on the AmpUp network — 4 Level 2. US DOE AFDC station 262203.
At a glance
Georgetown Library is a public EV charging station at 2 Maple St in Georgetown, Massachusetts, on the AmpUp network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 26, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 262203 |
| Network | AmpUp |
| Status | Available (E) |
| Access | Public |
| Facility | Library |
| Open date | Apr 26, 2023 |
| Last updated at source | Oct 2, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: $0.26 per kWh
Location
- Address
- 2 Maple St
- City
- Georgetown
- State
- Massachusetts
- ZIP
- 01833
- Coordinates
- 42.72470, -70.98922
Within ~15 km
Nearby charging
- Town of Middleton - town Hall14 ports
OpConnect · Available
- Town of Middleton- Public Safety12 ports
OpConnect · Available
- Danvers, MA - Tesla Supercharger12 ports
Tesla Supercharger · Available
- Edwards Vacuum10 ports
AmpUp · Available
- Fairfield Inn Amesbury10 ports
ChargeSmart EV · Available
ChargePoint · Available
What kind of charging does Georgetown Library offer?
Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 51% above the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.26 per kWh”. The site is listed as a library location.
How does Georgetown Library compare with other stations in Georgetown?
Georgetown has 5 charging stations in the DOE registry with 14 ports. Georgetown Library accounts for 29% of the charging ports in Georgetown. AmpUp runs 4 stations in Georgetown. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Georgetown Library?
AmpUp operates 1,322 stations in the registry across 47 states, with 18 DC fast and 5,339 Level 2 ports in total. 198 of those stations are in Massachusetts, 4% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 26, 2023, one of 633 stations in Massachusetts with a 2023 open date. The station's record was last updated at the source on Oct 2, 2026.
Frequently asked questions
How many chargers does Georgetown Library have?
Georgetown Library has 4 charging ports: 4 Level 2.
Does Georgetown Library have DC fast charging?
No. The registry lists no DC fast ports here; its 4 ports are all Level 2.
What connectors does Georgetown Library have?
Georgetown Library has J1772 connectors.
Is charging at Georgetown Library free?
Pricing as reported to the DOE registry: $0.26 per kWh.
Is Georgetown Library open to the public?
Yes. Georgetown Library is listed with public access, and its status is available.
Where is Georgetown Library?
Georgetown Library is at 2 Maple St, Georgetown, MA 01833. Its coordinates are 42.72470, -70.98922.
More EV charging around Georgetown
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 262203, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Georgetown Library, Georgetown, MA (AFDC station 262203)”, https://chargecensus.com/stations/massachusetts/georgetown-library-262203 (data as of October 12, 2026).