Gary Rome Lvl 3 Station 2
AvailableEV charging station in Holyoke, Massachusetts on the ChargePoint network — 1 DC fast. US DOE AFDC station 203088.
At a glance
Gary Rome Lvl 3 Station 2 is a public EV charging station at 150 Whiting Farms Rd in Holyoke, Massachusetts, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Dec 28, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 203088 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 28, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 150 Whiting Farms Rd
- City
- Holyoke
- State
- Massachusetts
- ZIP
- 01040
- Coordinates
- 42.18238, -72.63702
Within ~15 km
Nearby charging
- Springfield College20 ports
AmpUp · Available
- Holyoke MB.HPC12 ports
Mercedes-Benz HPC · Available
- Tower Square Garage12 ports
FLO · Available
- Holyoke, MA - Tesla Supercharger12 ports
Tesla Supercharger · Available
Tesla Supercharger · Available
- Cooley Dickinson Hospital12 ports
AmpUp · Available
What kind of charging does Gary Rome Lvl 3 Station 2 offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 62% below the Massachusetts average of 2.6 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Gary Rome Lvl 3 Station 2 compare with other stations in Holyoke?
Holyoke has 26 charging stations in the DOE registry with 79 ports. Gary Rome Lvl 3 Station 2 accounts for 1% of the charging ports in Holyoke. ChargePoint runs 14 stations in Holyoke. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Gary Rome Lvl 3 Station 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 28, 2021, one of 933 stations in Massachusetts with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Gary Rome Lvl 3 Station 2 have?
Gary Rome Lvl 3 Station 2 has 1 charging port: 1 DC fast.
Does Gary Rome Lvl 3 Station 2 have DC fast charging?
Yes. The registry lists 1 DC fast port at Gary Rome Lvl 3 Station 2, with CHAdeMO and CCS connectors.
What connectors does Gary Rome Lvl 3 Station 2 have?
Gary Rome Lvl 3 Station 2 has CHAdeMO and CCS connectors.
Is Gary Rome Lvl 3 Station 2 open to the public?
Yes. Gary Rome Lvl 3 Station 2 is listed with public access, and its status is available.
Where is Gary Rome Lvl 3 Station 2?
Gary Rome Lvl 3 Station 2 is at 150 Whiting Farms Rd, Holyoke, MA 01040. Its coordinates are 42.18238, -72.63702.
More EV charging around Holyoke
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 203088, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Gary Rome Lvl 3 Station 2, Holyoke, MA (AFDC station 203088)”, https://chargecensus.com/stations/massachusetts/gary-rome-lvl-3-station-2-203088 (data as of October 12, 2026).