Elizabth Brook 22(6,8)
AvailableEV charging station in Stow, Massachusetts on the ChargePoint network — 1 Level 2. US DOE AFDC station 459705.
At a glance
Elizabth Brook 22(6,8) is a public EV charging station at 22 Johnston Way in Stow, Massachusetts, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 16, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 459705 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | May 16, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 22 Johnston Way
- City
- Stow
- State
- Massachusetts
- ZIP
- 01775
- Coordinates
- 42.43323, -71.49658
Within ~15 km
Nearby charging
- Staples26 ports
Loop · Available
- Sherwood Plaza Front20 ports
Red E · Available
ViaLynk · Available
- National Grid - Northborough13 ports
Non-networked · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
What kind of charging does Elizabth Brook 22(6,8) offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 62% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Elizabth Brook 22(6,8) compare with other stations in Stow?
Stow has 22 charging stations in the DOE registry with 27 ports. Elizabth Brook 22(6,8) accounts for 4% of the charging ports in Stow. ChargePoint runs 21 stations in Stow. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Elizabth Brook 22(6,8)?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 16, 2026, one of 674 stations in Massachusetts with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Elizabth Brook 22(6,8) have?
Elizabth Brook 22(6,8) has 1 charging port: 1 Level 2.
Does Elizabth Brook 22(6,8) have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Elizabth Brook 22(6,8) have?
Elizabth Brook 22(6,8) has J1772 connectors.
Is Elizabth Brook 22(6,8) open to the public?
Yes. Elizabth Brook 22(6,8) is listed with public access, and its status is available.
Where is Elizabth Brook 22(6,8)?
Elizabth Brook 22(6,8) is at 22 Johnston Way, Stow, MA 01775. Its coordinates are 42.43323, -71.49658.
More EV charging around Stow
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 459705, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Elizabth Brook 22(6,8), Stow, MA (AFDC station 459705)”, https://chargecensus.com/stations/massachusetts/elizabth-brook-22-6-8-459705 (data as of October 12, 2026).