ChargeCensus

Cp EV Grove St 1

Available

EV charging station in Worcester, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 200506.

At a glance

Cp EV Grove St 1 is a public EV charging station at 474 Grove St in Worcester, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 4, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID200506
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateNov 4, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
474 Grove St
ZIP
01605
Coordinates
42.28905, -71.80947

Within ~15 km

Nearby charging

What kind of charging does Cp EV Grove St 1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Cp EV Grove St 1 compare with other stations in Worcester?

Worcester has 165 charging stations in the DOE registry with 445 ports, the 3rd-most of 331 cities and towns in Massachusetts. Cp EV Grove St 1 accounts for under 1% of the charging ports in Worcester. ChargePoint runs 144 stations in Worcester. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Cp EV Grove St 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 4, 2021, one of 933 stations in Massachusetts with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Cp EV Grove St 1 have?

Cp EV Grove St 1 has 2 charging ports: 2 Level 2.

Does Cp EV Grove St 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Cp EV Grove St 1 have?

Cp EV Grove St 1 has J1772 connectors.

Is Cp EV Grove St 1 open to the public?

Yes. Cp EV Grove St 1 is listed with public access, and its status is available.

Where is Cp EV Grove St 1?

Cp EV Grove St 1 is at 474 Grove St, Worcester, MA 01605. Its coordinates are 42.28905, -71.80947.

More EV charging around Worcester

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 200506, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Cp EV Grove St 1, Worcester, MA (AFDC station 200506)”, https://chargecensus.com/stations/massachusetts/cp-ev-grove-st-1-200506 (data as of October 12, 2026).