County Complex Deeds #1

Available

EV charging station in Barnstable, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 166954.

At a glance

County Complex Deeds #1 is a public EV charging station at 70 Railroad Ave in Barnstable, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 19, 2020.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID166954
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateSep 19, 2020
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
70 Railroad Ave
ZIP
02630
Coordinates
41.70062, -70.30595

Within ~15 km

Nearby charging

What kind of charging does County Complex Deeds #1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does County Complex Deeds #1 compare with other stations in Barnstable?

Barnstable has 31 charging stations in the DOE registry with 60 ports. County Complex Deeds #1 accounts for 3% of the charging ports in Barnstable. ChargePoint runs 28 stations in Barnstable. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates County Complex Deeds #1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 19, 2020, one of 314 stations in Massachusetts with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does County Complex Deeds #1 have?

County Complex Deeds #1 has 2 charging ports: 2 Level 2.

Does County Complex Deeds #1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does County Complex Deeds #1 have?

County Complex Deeds #1 has J1772 connectors.

Is County Complex Deeds #1 open to the public?

Yes. County Complex Deeds #1 is listed with public access, and its status is available.

Where is County Complex Deeds #1?

County Complex Deeds #1 is at 70 Railroad Ave, Barnstable, MA 02630. Its coordinates are 41.70062, -70.30595.

More EV charging around Barnstable

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 166954, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “County Complex Deeds #1, Barnstable, MA (AFDC station 166954)”, https://chargecensus.com/stations/massachusetts/county-complex-deeds-1-166954 (data as of October 12, 2026).