ChargeCensus

Chauncy Ev1 Station 1

Available

EV charging station in Westborough, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 294018.

At a glance

Chauncy Ev1 Station 1 is a public EV charging station at 11106 Peters Farm Wy in Westborough, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 23, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID294018
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJun 23, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
11106 Peters Farm Wy
ZIP
01581
Coordinates
42.30037, -71.60645

Within ~15 km

Nearby charging

What kind of charging does Chauncy Ev1 Station 1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Chauncy Ev1 Station 1 compare with other stations in Westborough?

Westborough has 21 charging stations in the DOE registry with 106 ports. Chauncy Ev1 Station 1 accounts for 2% of the charging ports in Westborough. ChargePoint runs 9 stations in Westborough. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Chauncy Ev1 Station 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 23, 2023, one of 633 stations in Massachusetts with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Chauncy Ev1 Station 1 have?

Chauncy Ev1 Station 1 has 2 charging ports: 2 Level 2.

Does Chauncy Ev1 Station 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Chauncy Ev1 Station 1 have?

Chauncy Ev1 Station 1 has J1772 connectors.

Is Chauncy Ev1 Station 1 open to the public?

Yes. Chauncy Ev1 Station 1 is listed with public access, and its status is available.

Where is Chauncy Ev1 Station 1?

Chauncy Ev1 Station 1 is at 11106 Peters Farm Wy, Westborough, MA 01581. Its coordinates are 42.30037, -71.60645.

More EV charging around Westborough

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 294018, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Chauncy Ev1 Station 1, Westborough, MA (AFDC station 294018)”, https://chargecensus.com/stations/massachusetts/chauncy-ev1-station-1-294018 (data as of October 12, 2026).