ChargeCensus

Cape Cod Mosquito Control Project

Available

EV charging station in Yarmouthport, Massachusetts, not on a charging network — 4 Level 2. US DOE AFDC station 325215.

At a glance

Cape Cod Mosquito Control Project is a private EV charging station at 259 Willow St in Yarmouthport, Massachusetts, not attached to a charging network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 1, 2023.

Total ports
4
DC fast
0
Level 2
4
Access
Private
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID325215
NetworkNon-networked
StatusAvailable (E)
AccessPrivate
FacilityOffice building
Open dateJul 1, 2023
Last updated at sourceFeb 13, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
259 Willow St
City
Yarmouthport
ZIP
02675
Coordinates
41.68915, -70.25674

Within ~15 km

Nearby charging

What kind of charging does Cape Cod Mosquito Control Project offer?

Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 51% above the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a office building location.

How does Cape Cod Mosquito Control Project compare with other stations in Yarmouthport?

Yarmouthport has 1 charging station in the DOE registry with 4 ports. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Cape Cod Mosquito Control Project?

Cape Cod Mosquito Control Project is listed as non-networked: its chargers are not run through a charging-network account. Massachusetts has 288 non-networked stations, 6% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is private, meaning use is restricted, for example to a fleet, employees or residents. It opened on Jul 1, 2023, one of 633 stations in Massachusetts with a 2023 open date. The station's record was last updated at the source on Feb 13, 2026.

Frequently asked questions

How many chargers does Cape Cod Mosquito Control Project have?

Cape Cod Mosquito Control Project has 4 charging ports: 4 Level 2.

Does Cape Cod Mosquito Control Project have DC fast charging?

No. The registry lists no DC fast ports here; its 4 ports are all Level 2.

What connectors does Cape Cod Mosquito Control Project have?

Cape Cod Mosquito Control Project has J1772 connectors.

Is Cape Cod Mosquito Control Project open to the public?

No. Cape Cod Mosquito Control Project is listed with private access.

Where is Cape Cod Mosquito Control Project?

Cape Cod Mosquito Control Project is at 259 Willow St, Yarmouthport, MA 02675. Its coordinates are 41.68915, -70.25674.

More EV charging around Yarmouthport

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 325215, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Cape Cod Mosquito Control Project, Yarmouthport, MA (AFDC station 325215)”, https://chargecensus.com/stations/massachusetts/cape-cod-mosquito-control-project-325215 (data as of October 12, 2026).