ChargeCensus

Bu Fleet 750 Comm #1

Available

EV charging station in Brookline, Massachusetts on the ChargePoint network — 1 Level 2. US DOE AFDC station 372082.

At a glance

Bu Fleet 750 Comm #1 is a public EV charging station at 750 Commonwealth Ave in Brookline, Massachusetts, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 28, 2024.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID372082
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateNov 28, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
750 Commonwealth Ave
ZIP
02446
Coordinates
42.34986, -71.10782

Within ~15 km

Nearby charging

What kind of charging does Bu Fleet 750 Comm #1 offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 62% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Bu Fleet 750 Comm #1 compare with other stations in Brookline?

Brookline has 27 charging stations in the DOE registry with 55 ports. Bu Fleet 750 Comm #1 accounts for 2% of the charging ports in Brookline. ChargePoint runs 25 stations in Brookline. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Bu Fleet 750 Comm #1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 28, 2024, one of 833 stations in Massachusetts with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Bu Fleet 750 Comm #1 have?

Bu Fleet 750 Comm #1 has 1 charging port: 1 Level 2.

Does Bu Fleet 750 Comm #1 have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Bu Fleet 750 Comm #1 have?

Bu Fleet 750 Comm #1 has J1772 connectors.

Is Bu Fleet 750 Comm #1 open to the public?

Yes. Bu Fleet 750 Comm #1 is listed with public access, and its status is available.

Where is Bu Fleet 750 Comm #1?

Bu Fleet 750 Comm #1 is at 750 Commonwealth Ave, Brookline, MA 02446. Its coordinates are 42.34986, -71.10782.

More EV charging around Brookline

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 372082, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Bu Fleet 750 Comm #1, Brookline, MA (AFDC station 372082)”, https://chargecensus.com/stations/massachusetts/bu-fleet-750-comm-1-372082 (data as of October 12, 2026).