Brookline Baker 02
AvailableEV charging station in Brookline, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 458192.
At a glance
Brookline Baker 02 is a public EV charging station at 205 Beverly Road in Brookline, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 24, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 458192 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Apr 24, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 205 Beverly Road
- City
- Brookline
- State
- Massachusetts
- ZIP
- 02467
- Coordinates
- 42.30292, -71.15739
Within ~15 km
Nearby charging
- Avalon Quincy Adams83 ports
Loop · Available
- The Proof64 ports
Loop · Available
- Encore Boston Harbor62 ports
Loop · Available
- Encore Boston Harbor Private43 ports
Loop · Available
Tesla Destination · Available
- MGH Charlestown 199 Garage32 ports
Non-networked · Available
What kind of charging does Brookline Baker 02 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Brookline Baker 02 compare with other stations in Brookline?
Brookline has 27 charging stations in the DOE registry with 55 ports. Brookline Baker 02 accounts for 4% of the charging ports in Brookline. ChargePoint runs 25 stations in Brookline. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Brookline Baker 02?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 24, 2026, one of 674 stations in Massachusetts with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Brookline Baker 02 have?
Brookline Baker 02 has 2 charging ports: 2 Level 2.
Does Brookline Baker 02 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Brookline Baker 02 have?
Brookline Baker 02 has J1772 connectors.
Is Brookline Baker 02 open to the public?
Yes. Brookline Baker 02 is listed with public access, and its status is available.
Where is Brookline Baker 02?
Brookline Baker 02 is at 205 Beverly Road, Brookline, MA 02467. Its coordinates are 42.30292, -71.15739.
More EV charging around Brookline
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 458192, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Brookline Baker 02, Brookline, MA (AFDC station 458192)”, https://chargecensus.com/stations/massachusetts/brookline-baker-02-458192 (data as of October 12, 2026).