EV charging station in Boston, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 355769.

At a glance

Brighton Landin Station 1 is a public EV charging station at 1 Guest Street in Boston, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 17, 2024.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID355769
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateSep 17, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
1 Guest Street
City
Boston
ZIP
02135
Coordinates
42.35655, -71.14704

Within ~15 km

Nearby charging

What kind of charging does Brighton Landin Station 1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Brighton Landin Station 1 compare with other stations in Boston?

Boston has 851 charging stations in the DOE registry with 2,154 ports, the most of 331 cities and towns in Massachusetts. Brighton Landin Station 1 accounts for under 1% of the charging ports in Boston. ChargePoint runs 751 stations in Boston. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Brighton Landin Station 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 17, 2024, one of 833 stations in Massachusetts with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Brighton Landin Station 1 have?

Brighton Landin Station 1 has 2 charging ports: 2 Level 2.

Does Brighton Landin Station 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Brighton Landin Station 1 have?

Brighton Landin Station 1 has J1772 connectors.

Is Brighton Landin Station 1 open to the public?

Yes. Brighton Landin Station 1 is listed with public access, and its status is available.

Where is Brighton Landin Station 1?

Brighton Landin Station 1 is at 1 Guest Street, Boston, MA 02135. Its coordinates are 42.35655, -71.14704.

More EV charging around Boston

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 355769, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Brighton Landin Station 1, Boston, MA (AFDC station 355769)”, https://chargecensus.com/stations/massachusetts/brighton-landin-station-1-355769 (data as of October 12, 2026).