Bridgewater State University Weygand Lot
AvailableEV charging station in Bridgewater, Massachusetts, not on a charging network — 6 Level 2. US DOE AFDC station 216284.
At a glance
Bridgewater State University Weygand Lot is a public EV charging station at 85 Burrill Ave in Bridgewater, Massachusetts, not attached to a charging network. It has 6 charging ports (6 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 25, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 216284 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | College campus |
| Open date | Apr 25, 2022 |
| Last updated at source | Sep 16, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: $0.30 per kWh and $4 per hour after 4 hours
Location
- Address
- 85 Burrill Ave
- City
- Bridgewater
- State
- Massachusetts
- ZIP
- 02324
- Coordinates
- 41.98469, -70.96408
Within ~15 km
Nearby charging
- Motel 6 - Brockton8 ports
Quickcharge · Available
Non-networked · Available
Non-networked · Available
- 24 Ford of Easton6 ports
EV Connect · Available
- Valley Storage6 ports
Red E · Available
- MBTA Middleborough Station6 ports
Non-networked · Available
What kind of charging does Bridgewater State University Weygand Lot offer?
Of its 6 ports, 6 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 2.3 times the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.30 per kWh and $4 per hour after 4 hours”. The site is listed as a college campus location. It is flagged as workplace charging.
How does Bridgewater State University Weygand Lot compare with other stations in Bridgewater?
Bridgewater has 30 charging stations in the DOE registry with 85 ports. Bridgewater State University Weygand Lot accounts for 7% of the charging ports in Bridgewater. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Bridgewater State University Weygand Lot?
Bridgewater State University Weygand Lot is listed as non-networked: its chargers are not run through a charging-network account. Massachusetts has 288 non-networked stations, 6% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 25, 2022, one of 551 stations in Massachusetts with a 2022 open date. The station's record was last updated at the source on Sep 16, 2026.
Frequently asked questions
How many chargers does Bridgewater State University Weygand Lot have?
Bridgewater State University Weygand Lot has 6 charging ports: 6 Level 2.
Does Bridgewater State University Weygand Lot have DC fast charging?
No. The registry lists no DC fast ports here; its 6 ports are all Level 2.
What connectors does Bridgewater State University Weygand Lot have?
Bridgewater State University Weygand Lot has J1772 connectors.
Is charging at Bridgewater State University Weygand Lot free?
Pricing as reported to the DOE registry: $0.30 per kWh and $4 per hour after 4 hours.
Is Bridgewater State University Weygand Lot open to the public?
Yes. Bridgewater State University Weygand Lot is listed with public access, and its status is available.
Where is Bridgewater State University Weygand Lot?
Bridgewater State University Weygand Lot is at 85 Burrill Ave, Bridgewater, MA 02324. Its coordinates are 41.98469, -70.96408.
More EV charging around Bridgewater
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 216284, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Bridgewater State University Weygand Lot, Bridgewater, MA (AFDC station 216284)”, https://chargecensus.com/stations/massachusetts/bridgewater-state-university-weygand-lot-216284 (data as of October 12, 2026).