Bozzuto Dev. Co Abby 4
AvailableEV charging station in Quincy, Massachusetts on the ChargePoint network — 1 Level 2. US DOE AFDC station 196346.
At a glance
Bozzuto Dev. Co Abby 4 is a public EV charging station at 273 Hancock St in Quincy, Massachusetts, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 25, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 196346 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Sep 25, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 273 Hancock St
- City
- Quincy
- State
- Massachusetts
- ZIP
- 02171
- Coordinates
- 42.27586, -71.02937
Within ~15 km
Nearby charging
- Avalon Quincy Adams83 ports
Loop · Available
- The Proof64 ports
Loop · Available
- Encore Boston Harbor62 ports
Loop · Available
- Encore Boston Harbor Private43 ports
Loop · Available
Tesla Destination · Available
- MGH Charlestown 199 Garage32 ports
Non-networked · Available
What kind of charging does Bozzuto Dev. Co Abby 4 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 62% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Bozzuto Dev. Co Abby 4 compare with other stations in Quincy?
Quincy has 82 charging stations in the DOE registry with 225 ports, the 7th-most of 331 cities and towns in Massachusetts. Bozzuto Dev. Co Abby 4 accounts for under 1% of the charging ports in Quincy. ChargePoint runs 71 stations in Quincy. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Bozzuto Dev. Co Abby 4?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 25, 2021, one of 933 stations in Massachusetts with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Bozzuto Dev. Co Abby 4 have?
Bozzuto Dev. Co Abby 4 has 1 charging port: 1 Level 2.
Does Bozzuto Dev. Co Abby 4 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Bozzuto Dev. Co Abby 4 have?
Bozzuto Dev. Co Abby 4 has J1772 connectors.
Is Bozzuto Dev. Co Abby 4 open to the public?
Yes. Bozzuto Dev. Co Abby 4 is listed with public access, and its status is available.
Where is Bozzuto Dev. Co Abby 4?
Bozzuto Dev. Co Abby 4 is at 273 Hancock St, Quincy, MA 02171. Its coordinates are 42.27586, -71.02937.
More EV charging around Quincy
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 196346, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Bozzuto Dev. Co Abby 4, Quincy, MA (AFDC station 196346)”, https://chargecensus.com/stations/massachusetts/bozzuto-dev-co-abby-4-196346 (data as of October 12, 2026).