ChargeCensus

Beld Admin Pkg Lot 2

Available

EV charging station in Braintree, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 161870.

At a glance

Beld Admin Pkg Lot 2 is a public EV charging station at 150 Potter Road in Braintree, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 12, 2020.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID161870
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJun 12, 2020
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
150 Potter Road
ZIP
02184
Coordinates
42.23350, -70.96633

Within ~15 km

Nearby charging

What kind of charging does Beld Admin Pkg Lot 2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Beld Admin Pkg Lot 2 compare with other stations in Braintree?

Braintree has 26 charging stations in the DOE registry with 88 ports. Beld Admin Pkg Lot 2 accounts for 2% of the charging ports in Braintree. ChargePoint runs 15 stations in Braintree. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Beld Admin Pkg Lot 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 12, 2020, one of 314 stations in Massachusetts with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Beld Admin Pkg Lot 2 have?

Beld Admin Pkg Lot 2 has 2 charging ports: 2 Level 2.

Does Beld Admin Pkg Lot 2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Beld Admin Pkg Lot 2 have?

Beld Admin Pkg Lot 2 has J1772 connectors.

Is Beld Admin Pkg Lot 2 open to the public?

Yes. Beld Admin Pkg Lot 2 is listed with public access, and its status is available.

Where is Beld Admin Pkg Lot 2?

Beld Admin Pkg Lot 2 is at 150 Potter Road, Braintree, MA 02184. Its coordinates are 42.23350, -70.96633.

More EV charging around Braintree

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 161870, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Beld Admin Pkg Lot 2, Braintree, MA (AFDC station 161870)”, https://chargecensus.com/stations/massachusetts/beld-admin-pkg-lot-2-161870 (data as of October 12, 2026).