ChargeCensus

Barnstable Town Hall

Available

EV charging station in Barnstable, Massachusetts, not on a charging network — 2 Level 2. US DOE AFDC station 75012.

At a glance

Barnstable Town Hall is a public EV charging station at 367 Main St in Barnstable, Massachusetts, not attached to a charging network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 1, 2013.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID75012
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityParking lot
Open dateNov 1, 2013
Last updated at sourceOct 27, 2025

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: Free

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
367 Main St
ZIP
02601
Coordinates
41.65132, -70.28379

Within ~15 km

Nearby charging

What kind of charging does Barnstable Town Hall offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a parking lot location.

How does Barnstable Town Hall compare with other stations in Barnstable?

Barnstable has 31 charging stations in the DOE registry with 60 ports. Barnstable Town Hall accounts for 3% of the charging ports in Barnstable. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Barnstable Town Hall?

Barnstable Town Hall is listed as non-networked: its chargers are not run through a charging-network account. Massachusetts has 288 non-networked stations, 6% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 1, 2013, one of 12 stations in Massachusetts with a 2013 open date. The station's record was last updated at the source on Oct 27, 2025.

Frequently asked questions

How many chargers does Barnstable Town Hall have?

Barnstable Town Hall has 2 charging ports: 2 Level 2.

Does Barnstable Town Hall have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Barnstable Town Hall have?

Barnstable Town Hall has J1772 connectors.

Is charging at Barnstable Town Hall free?

Pricing as reported to the DOE registry: Free.

Is Barnstable Town Hall open to the public?

Yes. Barnstable Town Hall is listed with public access, and its status is available.

Where is Barnstable Town Hall?

Barnstable Town Hall is at 367 Main St, Barnstable, MA 02601. Its coordinates are 41.65132, -70.28379.

More EV charging around Barnstable

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 75012, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Barnstable Town Hall, Barnstable, MA (AFDC station 75012)”, https://chargecensus.com/stations/massachusetts/barnstable-town-hall-75012 (data as of October 12, 2026).