Baker Ave 200 Baker Ave 2
AvailableEV charging station in Concord, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 422826.
At a glance
Baker Ave 200 Baker Ave 2 is a public EV charging station at 200 Baker Avenue Extension in Concord, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 25, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 422826 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Sep 25, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 200 Baker Avenue Extension
- City
- Concord
- State
- Massachusetts
- ZIP
- 01742
- Coordinates
- 42.45958, -71.38463
Within ~15 km
Nearby charging
- Abbott School29 ports
AmpUp · Available
- Bedford Campus18 ports
Blink · Available
AmpUp · Available
Blink · Available
Tesla Supercharger · Available
AmpUp · Available
What kind of charging does Baker Ave 200 Baker Ave 2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Baker Ave 200 Baker Ave 2 compare with other stations in Concord?
Concord has 20 charging stations in the DOE registry with 44 ports. Baker Ave 200 Baker Ave 2 accounts for 5% of the charging ports in Concord. ChargePoint runs 15 stations in Concord. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Baker Ave 200 Baker Ave 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 25, 2025, one of 680 stations in Massachusetts with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Baker Ave 200 Baker Ave 2 have?
Baker Ave 200 Baker Ave 2 has 2 charging ports: 2 Level 2.
Does Baker Ave 200 Baker Ave 2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Baker Ave 200 Baker Ave 2 have?
Baker Ave 200 Baker Ave 2 has J1772 connectors.
Is Baker Ave 200 Baker Ave 2 open to the public?
Yes. Baker Ave 200 Baker Ave 2 is listed with public access, and its status is available.
Where is Baker Ave 200 Baker Ave 2?
Baker Ave 200 Baker Ave 2 is at 200 Baker Avenue Extension, Concord, MA 01742. Its coordinates are 42.45958, -71.38463.
More EV charging around Concord
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 422826, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Baker Ave 200 Baker Ave 2, Concord, MA (AFDC station 422826)”, https://chargecensus.com/stations/massachusetts/baker-ave-200-baker-ave-2-422826 (data as of October 12, 2026).