ChargeCensus

Atlantic Toyota Atlantic Lot

Available

EV charging station in Lynn, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 175177.

At a glance

Atlantic Toyota Atlantic Lot is a public EV charging station at 671 lynnway in Lynn, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID175177
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJan 27, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
671 lynnway
City
Lynn
ZIP
01905
Coordinates
42.45211, -70.96304

Within ~15 km

Nearby charging

What kind of charging does Atlantic Toyota Atlantic Lot offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Atlantic Toyota Atlantic Lot compare with other stations in Lynn?

Lynn has 10 charging stations in the DOE registry with 28 ports. Atlantic Toyota Atlantic Lot accounts for 7% of the charging ports in Lynn. ChargePoint runs 6 stations in Lynn. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Atlantic Toyota Atlantic Lot?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 933 stations in Massachusetts with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Atlantic Toyota Atlantic Lot have?

Atlantic Toyota Atlantic Lot has 2 charging ports: 2 Level 2.

Does Atlantic Toyota Atlantic Lot have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Atlantic Toyota Atlantic Lot have?

Atlantic Toyota Atlantic Lot has J1772 connectors.

Is Atlantic Toyota Atlantic Lot open to the public?

Yes. Atlantic Toyota Atlantic Lot is listed with public access, and its status is available.

Where is Atlantic Toyota Atlantic Lot?

Atlantic Toyota Atlantic Lot is at 671 lynnway, Lynn, MA 01905. Its coordinates are 42.45211, -70.96304.

More EV charging around Lynn

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 175177, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Atlantic Toyota Atlantic Lot, Lynn, MA (AFDC station 175177)”, https://chargecensus.com/stations/massachusetts/atlantic-toyota-atlantic-lot-175177 (data as of October 12, 2026).