ChargeCensus

Are 389 Binney Oks 10

Available

EV charging station in Cambridge, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 350172.

At a glance

Are 389 Binney Oks 10 is a public EV charging station at 355 Binney Street in Cambridge, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 9, 2024.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID350172
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJul 9, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
355 Binney Street
ZIP
02141
Coordinates
42.36758, -71.08953

Within ~15 km

Nearby charging

What kind of charging does Are 389 Binney Oks 10 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Are 389 Binney Oks 10 compare with other stations in Cambridge?

Cambridge has 409 charging stations in the DOE registry with 968 ports, the 2nd-most of 331 cities and towns in Massachusetts. Are 389 Binney Oks 10 accounts for under 1% of the charging ports in Cambridge. ChargePoint runs 375 stations in Cambridge. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Are 389 Binney Oks 10?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 9, 2024, one of 833 stations in Massachusetts with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Are 389 Binney Oks 10 have?

Are 389 Binney Oks 10 has 2 charging ports: 2 Level 2.

Does Are 389 Binney Oks 10 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Are 389 Binney Oks 10 have?

Are 389 Binney Oks 10 has J1772 connectors.

Is Are 389 Binney Oks 10 open to the public?

Yes. Are 389 Binney Oks 10 is listed with public access, and its status is available.

Where is Are 389 Binney Oks 10?

Are 389 Binney Oks 10 is at 355 Binney Street, Cambridge, MA 02141. Its coordinates are 42.36758, -71.08953.

More EV charging around Cambridge

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 350172, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Are 389 Binney Oks 10, Cambridge, MA (AFDC station 350172)”, https://chargecensus.com/stations/massachusetts/are-389-binney-oks-10-350172 (data as of October 12, 2026).