ChargeCensus

Amherst Off Pk Aop North Side

Available

EV charging station in Amherst, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 143305.

At a glance

Amherst Off Pk Aop North Side is a public EV charging station at 417 West St in Amherst, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 15, 2019.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID143305
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateAug 15, 2019
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
417 West St
ZIP
01002
Coordinates
42.34183, -72.52067

Within ~15 km

Nearby charging

What kind of charging does Amherst Off Pk Aop North Side offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Amherst Off Pk Aop North Side compare with other stations in Amherst?

Amherst has 47 charging stations in the DOE registry with 104 ports, the 15th-most of 331 cities and towns in Massachusetts. Amherst Off Pk Aop North Side accounts for 2% of the charging ports in Amherst. ChargePoint runs 44 stations in Amherst. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Amherst Off Pk Aop North Side?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 15, 2019, one of 106 stations in Massachusetts with a 2019 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Amherst Off Pk Aop North Side have?

Amherst Off Pk Aop North Side has 2 charging ports: 2 Level 2.

Does Amherst Off Pk Aop North Side have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Amherst Off Pk Aop North Side have?

Amherst Off Pk Aop North Side has J1772 connectors.

Is Amherst Off Pk Aop North Side open to the public?

Yes. Amherst Off Pk Aop North Side is listed with public access, and its status is available.

Where is Amherst Off Pk Aop North Side?

Amherst Off Pk Aop North Side is at 417 West St, Amherst, MA 01002. Its coordinates are 42.34183, -72.52067.

More EV charging around Amherst

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 143305, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Amherst Off Pk Aop North Side, Amherst, MA (AFDC station 143305)”, https://chargecensus.com/stations/massachusetts/amherst-off-pk-aop-north-side-143305 (data as of October 12, 2026).