ChargeCensus

Albertsons Burlington #0495

Available

EV charging station in Burlington, Massachusetts on the EVgo network — 6 DC fast. US DOE AFDC station 416069.

At a glance

Albertsons Burlington #0495 is a public EV charging station at 180 A Cambridge Street in Burlington, Massachusetts, on the EVgo network. It has 6 charging ports (6 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Jul 12, 2025.

Total ports
6
DC fast
6
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID416069
NetworkEVgo
StatusAvailable (E)
AccessPublic
Open dateJul 12, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

EVgo

Operates 1,220 stations in the DOE registry — view the full network →

Location

Address
180 A Cambridge Street
ZIP
01803
Coordinates
42.51048, -71.19770

Within ~15 km

Nearby charging

What kind of charging does Albertsons Burlington #0495 offer?

Of its 6 ports, 6 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 2.3 times the Massachusetts average of 2.6 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.

How does Albertsons Burlington #0495 compare with other stations in Burlington?

Burlington has 48 charging stations in the DOE registry with 116 ports, the 14th-most of 331 cities and towns in Massachusetts. Albertsons Burlington #0495 accounts for 5% of the charging ports in Burlington. It is the only EVgo station in Burlington. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Albertsons Burlington #0495?

DC fast-focused urban charging network. EVgo operates 1,220 stations in the registry across 48 states, with 5,381 DC fast and 120 Level 2 ports in total. 18 of those stations are in Massachusetts, under 1% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 12, 2025, one of 680 stations in Massachusetts with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Albertsons Burlington #0495 have?

Albertsons Burlington #0495 has 6 charging ports: 6 DC fast.

Does Albertsons Burlington #0495 have DC fast charging?

Yes. The registry lists 6 DC fast ports at Albertsons Burlington #0495, with CCS connectors.

What connectors does Albertsons Burlington #0495 have?

Albertsons Burlington #0495 has CCS connectors.

Is Albertsons Burlington #0495 open to the public?

Yes. Albertsons Burlington #0495 is listed with public access, and its status is available.

Where is Albertsons Burlington #0495?

Albertsons Burlington #0495 is at 180 A Cambridge Street, Burlington, MA 01803. Its coordinates are 42.51048, -71.19770.

More EV charging around Burlington

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 416069, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Albertsons Burlington #0495, Burlington, MA (AFDC station 416069)”, https://chargecensus.com/stations/massachusetts/albertsons-burlington-0495-416069 (data as of October 12, 2026).