ChargeCensus

Aeg Aeg / Chestnut

Available

EV charging station in Springfield, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 224513.

At a glance

Aeg Aeg / Chestnut is a public EV charging station at 355Plainfield St in Springfield, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 28, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID224513
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJul 28, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
355Plainfield St
ZIP
01107
Coordinates
42.11681, -72.61198

Within ~15 km

Nearby charging

What kind of charging does Aeg Aeg / Chestnut offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Aeg Aeg / Chestnut compare with other stations in Springfield?

Springfield has 90 charging stations in the DOE registry with 275 ports, the 5th-most of 331 cities and towns in Massachusetts. Aeg Aeg / Chestnut accounts for under 1% of the charging ports in Springfield. ChargePoint runs 64 stations in Springfield. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Aeg Aeg / Chestnut?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 28, 2022, one of 551 stations in Massachusetts with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Aeg Aeg / Chestnut have?

Aeg Aeg / Chestnut has 2 charging ports: 2 Level 2.

Does Aeg Aeg / Chestnut have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Aeg Aeg / Chestnut have?

Aeg Aeg / Chestnut has J1772 connectors.

Is Aeg Aeg / Chestnut open to the public?

Yes. Aeg Aeg / Chestnut is listed with public access, and its status is available.

Where is Aeg Aeg / Chestnut?

Aeg Aeg / Chestnut is at 355Plainfield St, Springfield, MA 01107. Its coordinates are 42.11681, -72.61198.

More EV charging around Springfield

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 224513, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Aeg Aeg / Chestnut, Springfield, MA (AFDC station 224513)”, https://chargecensus.com/stations/massachusetts/aeg-aeg-chestnut-224513 (data as of October 12, 2026).