639 Granite Street is a public EV charging station at 639 Granite Street in Braintree, Massachusetts, on the Red E network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 13, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 451119 |
| Network | Red E |
| Status | Available (E) |
| Access | Public |
| Facility | Public site |
| Open date | Feb 13, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 639 Granite Street
- City
- Braintree
- State
- Massachusetts
- ZIP
- 02184
- Coordinates
- 42.20974, -71.02191
Within ~15 km
Nearby charging
- Avalon Quincy Adams83 ports
Loop · Available
- The Proof64 ports
Loop · Available
- Sbwtc24 ports
Blink · Available
- Rowes Wharf22 ports
AmpUp · Available
AmpUp · Available
- Canton, MA - Tesla Supercharger20 ports
Tesla Supercharger · Available
What kind of charging does 639 Granite Street offer?
Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 51% above the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a public site location.
How does 639 Granite Street compare with other stations in Braintree?
Braintree has 26 charging stations in the DOE registry with 88 ports. 639 Granite Street accounts for 5% of the charging ports in Braintree. Red E runs 2 stations in Braintree. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates 639 Granite Street?
Red E operates 1,105 stations in the registry across 47 states, with 2,240 DC fast and 2,633 Level 2 ports in total. 153 of those stations are in Massachusetts, 3% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 13, 2026, one of 674 stations in Massachusetts with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does 639 Granite Street have?
639 Granite Street has 4 charging ports: 4 Level 2.
Does 639 Granite Street have DC fast charging?
No. The registry lists no DC fast ports here; its 4 ports are all Level 2.
What connectors does 639 Granite Street have?
639 Granite Street has J1772 connectors.
Is 639 Granite Street open to the public?
Yes. 639 Granite Street is listed with public access, and its status is available.
Where is 639 Granite Street?
639 Granite Street is at 639 Granite Street, Braintree, MA 02184. Its coordinates are 42.20974, -71.02191.
More EV charging around Braintree
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 451119, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “639 Granite Street, Braintree, MA (AFDC station 451119)”, https://chargecensus.com/stations/massachusetts/639-granite-street-451119 (data as of October 12, 2026).