400 Dlb EV 290 Dlb #2
AvailableEV charging station in Marlborough, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 165106.
At a glance
400 Dlb EV 290 Dlb #2 is a public EV charging station at 290 Donald Lynch Blvd in Marlborough, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 11, 2020.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 165106 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 11, 2020 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 290 Donald Lynch Blvd
- City
- Marlborough
- State
- Massachusetts
- ZIP
- 01752
- Coordinates
- 42.36143, -71.60086
Within ~15 km
Nearby charging
- Staples26 ports
Loop · Available
ViaLynk · Available
- National Grid - Northborough13 ports
Non-networked · Available
Tesla Supercharger · Available
- 100 Maple Ave12 ports
EV Connect · Available
AmpUp · Available
What kind of charging does 400 Dlb EV 290 Dlb #2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does 400 Dlb EV 290 Dlb #2 compare with other stations in Marlborough?
Marlborough has 93 charging stations in the DOE registry with 233 ports, the 4th-most of 331 cities and towns in Massachusetts. 400 Dlb EV 290 Dlb #2 accounts for under 1% of the charging ports in Marlborough. ChargePoint runs 73 stations in Marlborough. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates 400 Dlb EV 290 Dlb #2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 11, 2020, one of 314 stations in Massachusetts with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does 400 Dlb EV 290 Dlb #2 have?
400 Dlb EV 290 Dlb #2 has 2 charging ports: 2 Level 2.
Does 400 Dlb EV 290 Dlb #2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does 400 Dlb EV 290 Dlb #2 have?
400 Dlb EV 290 Dlb #2 has J1772 connectors.
Is 400 Dlb EV 290 Dlb #2 open to the public?
Yes. 400 Dlb EV 290 Dlb #2 is listed with public access, and its status is available.
Where is 400 Dlb EV 290 Dlb #2?
400 Dlb EV 290 Dlb #2 is at 290 Donald Lynch Blvd, Marlborough, MA 01752. Its coordinates are 42.36143, -71.60086.
More EV charging around Marlborough
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 165106, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “400 Dlb EV 290 Dlb #2, Marlborough, MA (AFDC station 165106)”, https://chargecensus.com/stations/massachusetts/400-dlb-ev-290-dlb-2-165106 (data as of October 12, 2026).