ChargeCensus

150 Draper

Available

EV charging station in North Attleborough, Massachusetts on the Loop network — 1 Level 2. US DOE AFDC station 470228.

At a glance

150 Draper is a public EV charging station at 150 Draper Ave in North Attleborough, Massachusetts, on the Loop network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 18, 2026.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID470228
NetworkLoop
StatusAvailable (E)
AccessPublic
FacilityOther
Open dateMay 18, 2026
Last updated at sourceSep 22, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: $20 monthly service fee; $0.54 per kWh

Charging network

Loop

Operates 1,233 stations in the DOE registry — view the full network →

Location

Address
150 Draper Ave
ZIP
02760
Coordinates
41.95120, -71.34821

Within ~15 km

Nearby charging

What kind of charging does 150 Draper offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 62% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$20 monthly service fee; $0.54 per kWh”. The site is listed as a other location.

How does 150 Draper compare with other stations in North Attleborough?

North Attleborough has 12 charging stations in the DOE registry with 28 ports. 150 Draper accounts for 4% of the charging ports in North Attleborough. It is the only Loop station in North Attleborough. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates 150 Draper?

Loop operates 1,233 stations in the registry across 40 states, with 162 DC fast and 9,900 Level 2 ports in total. 32 of those stations are in Massachusetts, under 1% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 18, 2026, one of 674 stations in Massachusetts with a 2026 open date. The station's record was last updated at the source on Sep 22, 2026.

Frequently asked questions

How many chargers does 150 Draper have?

150 Draper has 1 charging port: 1 Level 2.

Does 150 Draper have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does 150 Draper have?

150 Draper has J1772 connectors.

Is charging at 150 Draper free?

Pricing as reported to the DOE registry: $20 monthly service fee; $0.54 per kWh.

Is 150 Draper open to the public?

Yes. 150 Draper is listed with public access, and its status is available.

Where is 150 Draper?

150 Draper is at 150 Draper Ave, North Attleborough, MA 02760. Its coordinates are 41.95120, -71.34821.

More EV charging around North Attleborough

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 470228, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “150 Draper, North Attleborough, MA (AFDC station 470228)”, https://chargecensus.com/stations/massachusetts/150-draper-470228 (data as of October 12, 2026).