141 Winthrop Bulger 4
AvailableEV charging station in Lawrence, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 174218.
At a glance
141 Winthrop Bulger 4 is a public EV charging station at 141 Winthrop Ave in Lawrence, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 174218 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 27, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 141 Winthrop Ave
- City
- Lawrence
- State
- Massachusetts
- ZIP
- 01843
- Coordinates
- 42.68722, -71.14554
Within ~15 km
Nearby charging
- Town of Middleton - town Hall14 ports
OpConnect · Available
- Salem, NH - Tesla Supercharger12 ports
Tesla Supercharger · Available
Tesla Supercharger · Available
- Town of Middleton- Public Safety12 ports
OpConnect · Available
- Fairfield Inn - Tewksbury10 ports
ChargeSmart EV · Available
- Lawrence General Hospital10 ports
FLO · Available
What kind of charging does 141 Winthrop Bulger 4 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does 141 Winthrop Bulger 4 compare with other stations in Lawrence?
Lawrence has 27 charging stations in the DOE registry with 79 ports. 141 Winthrop Bulger 4 accounts for 3% of the charging ports in Lawrence. ChargePoint runs 18 stations in Lawrence. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates 141 Winthrop Bulger 4?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 933 stations in Massachusetts with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does 141 Winthrop Bulger 4 have?
141 Winthrop Bulger 4 has 2 charging ports: 2 Level 2.
Does 141 Winthrop Bulger 4 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does 141 Winthrop Bulger 4 have?
141 Winthrop Bulger 4 has J1772 connectors.
Is 141 Winthrop Bulger 4 open to the public?
Yes. 141 Winthrop Bulger 4 is listed with public access, and its status is available.
Where is 141 Winthrop Bulger 4?
141 Winthrop Bulger 4 is at 141 Winthrop Ave, Lawrence, MA 01843. Its coordinates are 42.68722, -71.14554.
More EV charging around Lawrence
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 174218, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “141 Winthrop Bulger 4, Lawrence, MA (AFDC station 174218)”, https://chargecensus.com/stations/massachusetts/141-winthrop-bulger-4-174218 (data as of October 12, 2026).