ChargeCensus

111 Autumn Lane 125 Autumn 7

Available

EV charging station in Boston, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 213410.

At a glance

111 Autumn Lane 125 Autumn 7 is a public EV charging station at 61 Pier 4 Blvd. in Boston, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 5, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID213410
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateApr 5, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
61 Pier 4 Blvd.
City
Boston
ZIP
02210
Coordinates
42.35023, -71.04489

Within ~15 km

Nearby charging

What kind of charging does 111 Autumn Lane 125 Autumn 7 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does 111 Autumn Lane 125 Autumn 7 compare with other stations in Boston?

Boston has 851 charging stations in the DOE registry with 2,154 ports, the most of 331 cities and towns in Massachusetts. 111 Autumn Lane 125 Autumn 7 accounts for under 1% of the charging ports in Boston. ChargePoint runs 751 stations in Boston. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates 111 Autumn Lane 125 Autumn 7?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 5, 2022, one of 551 stations in Massachusetts with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does 111 Autumn Lane 125 Autumn 7 have?

111 Autumn Lane 125 Autumn 7 has 2 charging ports: 2 Level 2.

Does 111 Autumn Lane 125 Autumn 7 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does 111 Autumn Lane 125 Autumn 7 have?

111 Autumn Lane 125 Autumn 7 has J1772 connectors.

Is 111 Autumn Lane 125 Autumn 7 open to the public?

Yes. 111 Autumn Lane 125 Autumn 7 is listed with public access, and its status is available.

Where is 111 Autumn Lane 125 Autumn 7?

111 Autumn Lane 125 Autumn 7 is at 61 Pier 4 Blvd., Boston, MA 02210. Its coordinates are 42.35023, -71.04489.

More EV charging around Boston

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 213410, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “111 Autumn Lane 125 Autumn 7, Boston, MA (AFDC station 213410)”, https://chargecensus.com/stations/massachusetts/111-autumn-lane-125-autumn-7-213410 (data as of October 12, 2026).