ChargeCensus

Tlc Spectrum2

Available

EV charging station in Portland, Maine on the ChargePoint network — 2 Level 2. US DOE AFDC station 201387.

At a glance

Tlc Spectrum2 is a public EV charging station at 90 Johnson Rd in Portland, Maine, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 19, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID201387
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateNov 19, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
90 Johnson Rd
State
Maine
ZIP
04102
Coordinates
43.64871, -70.32445

Within ~15 km

Nearby charging

What kind of charging does Tlc Spectrum2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 21% below the Maine average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Tlc Spectrum2 compare with other stations in Portland?

Portland has 60 charging stations in the DOE registry with 242 ports, the most of 136 cities and towns in Maine. Tlc Spectrum2 accounts for under 1% of the charging ports in Portland. ChargePoint runs 29 stations in Portland. Statewide, Maine has 694 stations and 1,759 ports, the 27th-largest station count of the 51 states and DC. The biggest station in Maine, USM Parking Garage in Portland, has 58 ports.

Who operates Tlc Spectrum2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 333 of those stations are in Maine, 48% of the state's 694.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 19, 2021, one of 59 stations in Maine with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Tlc Spectrum2 have?

Tlc Spectrum2 has 2 charging ports: 2 Level 2.

Does Tlc Spectrum2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Tlc Spectrum2 have?

Tlc Spectrum2 has J1772 connectors.

Is Tlc Spectrum2 open to the public?

Yes. Tlc Spectrum2 is listed with public access, and its status is available.

Where is Tlc Spectrum2?

Tlc Spectrum2 is at 90 Johnson Rd, Portland, ME 04102. Its coordinates are 43.64871, -70.32445.

More EV charging around Portland

Working with Maine charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 201387, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Tlc Spectrum2, Portland, ME (AFDC station 201387)”, https://chargecensus.com/stations/maine/tlc-spectrum2-201387 (data as of October 12, 2026).